background image

Connect HOT water supply to inlet of left SHANK and COLD
water supply to right SHANK using sealant, appropriate
connectors, and COUPLING NUTS.

Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to

waste outlet.

Thread TEE BODY 

(4)

 to SPOUT SHANK 

(5)

.

Thread HOSE CONNECTOR 

(6, 6A)

 to VALVE CONNECTIONS 

(7, 7A)

.

8

Connect water supply to VALVE BODIES 

(1,1A)

 with 1/2" IPS FLEXIBLE

SUPPLIES 

(2)

 or 3/8" O.D. BULL-NOSE RISERS 

(3)

. Use

adjustable wrench to tighten connections. Do not over 
tighten. Be careful not to kink copper supply when bending. 
Use tubing cutter to cut to proper length.

MAKE WATER SUPPLY AND WASTE CONNECTIONS

NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED

AND MUST BE PURCHASED SEPARATELY.

HOT

COLD

FERRULE

COMPRESSION

NUT

COUPLING

NUT

FLEXIBLE

SUPPLIES

1

1A

3/8 O.D.

BULL-NOSE

RISERS

1/2" PIPE THREAD

 

 

3/8 COMPRESSION

CONNECTION

2

3

4

5

7

6

6A

7A

Thread CABLE CONNECTOR 

(1) 

clockwise

onto DRAIN BODY CONNECTION 

(2)

 and

hand tighten. 

Fig.

 

A.

Your new POP-UP DRAIN installation is
now complete. 

Fig.

 

B.

Note: 

Tailpeice on pop-up drain is 1-1/4” O.D.

Fig.

 

B.

Fig.

 

A.

ATTACH CABLE CONNECTOR

6

2

1

Operate LIFT KNOB 

(1)

 to verify that STOPPER 

(2) 

opens and

closes.

Note: 

If STOPPER 

(2)

 does not open and close properly then 

refer to the “troubleshooting section” of these instructions.

CHECK OPERATION OF POP-UP

7

1-1/4” O.D.

Fig.

 

B.

WASTE

OUTLET

1

2

3

U S 6 0 3 8 5   R e v.   1 . 2

Содержание Williamsburg 2808.222

Страница 1: ...et handles won t work correctly If necessary adjust LOCKNUT 11 1 1A Certified to comply with ANSI A112 18 1 Installation Instructions INSTALL SPOUT INSTALL VALVE BODY 2 10 9 11 12 12a 10 9 12 11 3 Place RUBBER RING 9 into ESCUTCHEON 10 5 16 MIN 7 Adjustable Wrench Screwdriver Channel Locks Recommended tools Tubing Cutter Fig B 1 US60385 Rev 1 2 Widespread Lavatory Faucet with the Speed Connect Dra...

Страница 2: ... COVER 1 Remove CARDBOARD SPACER 2 from under DRAIN POP UP 3 Fig A 2 REAR OF SINK 4 5 6 3 1 SINK DRAIN HOLE FLAT SIDE OF GASKET MUST FACE DOWN 1 2 Fig A 2 1 FLAT SIDE OF GRAY LOCKNUT MUST FACE UP INSTALL GRAY LOCKNUT 5 Install GRAY LOCKNUT 1 onto DRAIN BODY 2 from below SINK Fig A Note The flat side of the GRAY LOCKNUT 1 must face up Tighten firmly by hand No tools are required Check DRAIN FLANGE ...

Страница 3: ...TER SUPPLY AND WASTE CONNECTIONS NOTE FLEXIBLE SUPPLIES OR BULL NOSE RISERS NOT INCLUDED AND MUST BE PURCHASED SEPARATELY HOT COLD FERRULE COMPRESSION NUT COUPLING NUT FLEXIBLE SUPPLIES 1 1A 3 8 O D BULL NOSE RISERS 1 2 PIPE THREAD 3 8 COMPRESSION CONNECTION 2 3 4 5 7 6 6A 7A Thread CABLE CONNECTOR 1 clockwise onto DRAIN BODY CONNECTION 2 and hand tighten Fig A Your new POP UP DRAIN installation i...

Страница 4: ...Thread HANDLE BASE 3 onto VALVE ESCUTCHEON 7 Push LEVER BALL 4 onto ADAPTER 1 Push ADAPTER 1 on VALVE STEM 2 so that the hole of the ADAPTER 1 without spline is facing up INSTALL HANDLES 6 INSTALLATION OF OPTIONAL METAL LEVER HANDLES Supplied with Faucet Thread PORCELIAN LEVER HANDLE 2 counter clockwise and remove INDEX BUTTON with MOUNTING ROD ASSEMBLY 1 Insert MOUNTING ROD ASSEMBLY 1 into METAL ...

Отзывы: