
TAM9-SF-1D-EN
39
Troubleshooting Low Superheat - page 3
P3
STEP 8
Perform Close
ValveTest
Suction pressure
drops
Yes
To
A
STEP 9
Ohm Coil per
StepperMotor Tables
No
46 ohms are
present across all
terminal pairs
No
Replace Stepper
Motor and retest for
Low Superheat
System has
proper
Superheat
Yes
To
A
Yes
No
STEP 10
Perform Frost Test
All Distributors
frost equally
Yes
To
A
STEP 11
Perform External
Check Valve Test
No
System has
proper
Superheat
Yes
Replace Tube
Assembly and Check
Valve
To
A
No
Perform Frost Test
All Distributors
frost equally
No
Replace Coil
Yes
A
Troubleshooting Low Superheat process is complete,
clear all EVC Board Fault Codes. If Low Superheat
condition has NOT been resolved, contact your FSR
or local distributor for further assistance
1 Frost Test Procedures
1. Remove Sensor harness from Connector J3 on
Electronic Expansion Valve Control Board.
2. Remove Coil panel.
3. Run System cooling in highest stage available.
4. Observe frost pattern on all Distributor tubes.
2 Check Valve Test Procedure
Warning:
This procedure is destructive and could require
repair or replacement of Valve Assembly following test.
1. Run System cooling in highest stage available for 15-20 minutes.
2. Pinch off Liquid Line between Check Valve and Distributor Assembly.
3. When Valve is fully crimped measure Superheat.
T
Trro
ou
ub
blle
essh
ho
oo
ottiin
ng
g
Содержание TAM9A0A24V21DA
Страница 35: ...TAM9 SF 1D EN 35 Troubleshooting ...