FINISHED WALL
4"
TOP OF TUB RIM
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
3-5/8" REF.
1-5/8" TO 3-1/4"
18" OPTIONAL
5-1/8" REF.
1/2" NPT
1/2" NPT''
6-3/4"
3-5/8"
5-1/2" REF.
"SEE ILLUSTRATION "
Certified to comply with ANSI A112.18.1
THREADED INLETS
INLETS 3-3/8"
INLETS 1/2" NPT
3-3/8"
SHR. 1/2" NPT
TUB PORT 1/2" NPT
'
ROUGHING-IN DIMENSIONS
Installation
Instructions
To assure proper positioning in relation
to wall, note roughing-in dimensions.
4 5 0 1
4 5 0 1 S
SYMPHONY
1
ROUGHING-IN
Turn off water at main supply.
CAUTION
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread
sealant or Teflon tape on threaded connections.
NOTE
If the valve is installed on a fiberglass
or other thin wall application, the
PLASTER GUARD
(4)
can be used as a support.
Connect hot and cold water supplies.
Cap off shower pipe
(5)
and tub filler pipe
(6)
.
For support, use pipe BRACES
(7)
secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.
COLD
HOT
Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow access
to the stops.
Remove PLASTER GUARD
(4),
rotate 90˚
so that indicated screw holes fit MANIFOLD
(2)
.
Push CAP on valve, place ESCUTCHEON on and
attach with screws.
1
7
5
3
6
4
2
See Roughing-in diagram before starting.
Connections are:
1/2" female NPT for threaded inlets
Connect RISER PIPE
(1)
to MANIFOLD
(2)
top outlet marked
"SHR"
.
Connect TUB FILLER PIPE
(3)
at bottom
outlet marked
"TUB"
.
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD
(4)
.
M 9 6 8 8 0 5 R E V. 1 . 4
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
PRESSURE BALANCING BATH
AND SHOWER TRIM KITS
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.