American Standard RU101SS Скачать руководство пользователя страница 2

- 2 -

M965907 Rev. 1.2 (8/19)

STANDARD WALL INSTALLATION

1

CAUTION

Turn off hot and cold water 

supplies before beginning.

COLD

1

2

3

WOOD 

SCREWS

CROSS BRACE

HOT

6

8

SERVICE

STOPS

4"

(101 mm)

2 x 4

Cross

Brace

7/8" TO 2"

(22 mm to

50 mm)

3-1/2"

(100 mm)

2-3/4" MAX.

(69 mm)

1-3/4" MIN.

(45 mm)

SIDE VIEW

NOTE: TO AVOID SHOWER RISE OR

OTHER RELATED ISSUES, 

DO NOT

USE 

PEX

 CONNECTIONS AT THE TUB

OUTLET CONNECTING TO THE TUB

SPOUT.

n

    

See Roughing-in diagram before starting. 

n

       

Remove the PLASTER GUARD 

(8)

 for proper installation. 

n

      

Mount VALVE BODY to cross brace (2" X 4") with-in wall. Use wood screws to secure VALVE BODY to brace. 

n

      

Connect HOT and COLD water supplies per connection method of selected valve. 

n

      

Connect RISER PIPE 

(1)

 to VALVE BODY 

(2)

 top outlet marked “UP”. 

n

      

Connect TUB FILLER PIPE 

(3)

 to bottom outlet. 

n

      

Install PLASTER GUARD 

(8)

 back onto the valve. Only remove PLASTER GUARD 

(8)

 when ready to install trim Kit. 

n

      

Finished wall should allow for a  4" diameter opening (Use PLASTER GUARD for guidance)

n

      

Screw driver stops are primarly used to shut water off. To shut 

“HOT”

 or 

“COLD”

 water using a flat head screw driver,  

turn the head of the screw vertically. And to turn the water back on, turn the screw horizontally. 

CAUTION: After valve installation, inspect the VALVE BODY for any debris. It can damage Pressure Balance  
Valve cartridge.
NOTE: For back to back installation, follow steps mentioned above.  Reversal of Hot/Cold water supplies is  
accomplished by rotating cartridge (supplied with trim) 180° during installation. 

Содержание RU101SS

Страница 1: ...3 5 8 166 mm 6 1 2 RU109SS 92 mm 3 5 8 168 mm 6 5 8 OUTLETS 1 2 NOM COPPER SWEAT or 1 2 NPT 92 mm 3 5 8 126 mm 4 7 8 INLETS 1 2 PEX ASTM F1960 OUTLETS 1 2 NOM COPPER SWEAT or 1 2 NPT INLETS 1 2 NOM C...

Страница 2: ...onnection method of selected valve n Connect RISER PIPE 1 to VALVE BODY 2 top outlet marked UP n Connect TUB FILLER PIPE 3 to bottom outlet n Install PLASTER GUARD 8 back onto the valve Only remove PL...

Страница 3: ...sure to position the Locking feature screw as shown in Figure A below Once the valve is positioned on the Thin Wall turn counterclockwise as shown in Figure B to secure VALVE BODY 2 in place n Connec...

Страница 4: ...n Holder 8 and the two SCREWS 5 can be found packaged with the Belshire Trim rather than the valve n Connect HOT and COLD water supplies per connection method of selected valve n Connect RISER PIPE 1...

Страница 5: ...r shower only installation flush cold supply line first in Orientation A Then reverse to Orientation B and flush hot supply line Alternatively the flush plug can be removed entirely to flush water thr...

Страница 6: ...RATELY RU108ESS RU109SS RU107ESS 1 2 1 2 1 2 3 3 3 4 4 4 MODEL NUMBERS RU101SS RU102SS RU107SS RU108SS RU109SS RU107ESS RU108ESS HOT LINE FOR HELP For toll free information and answers to your questio...

Страница 7: ...SORTIES 1 2 PO NOM BRASAGE DU CUIVRE OU FILETAGES NPT 1 2 PO ENTR ES 1 2 PO NOM CPVC OBTURATEUR DE PL TRAGE FILETAGES NPT 1 2 po MUR FINI BASE DE LA BAIGNOIRE FACULTATIF VERS LE PLANCHER FINI G N RAL...

Страница 8: ...semble de garniture n Le mur fini doit pouvoir accueillir une ouverture de 4 po de diam tre se guider l aide de L OBTURATEUR DE PL TRAGE INSTALLATION MURALE STANDARD ATTENTION Une fois le robinet inst...

Страница 9: ...faire tourner dans le sens antihoraire conform ment l illustration B pour fixer le CORPS DE ROBINET 2 n Raccorder les alimentations en eau CHAUDE et FROIDE en suivant la m thode correspondant au robi...

Страница 10: ...AGE 7 fermement Remarque Vous trouverez la PLAQUE DE MONTAGE 4 les VIS DE MONTAGE 7 le support de la PLAQUE DE FINITION 8 et les deux VIS 5 dans les emballages des garnitures Belshire plut t que dans...

Страница 11: ...la conduite d alimentation d eau froide avec l orientation A d abord Inversez ensuite la bonde l orientation B et purgez la conduite d alimentation d eau chaude Une autre fa on de proc der est d enle...

Страница 12: ...BOUCHON DE BRASAGE PO 2 M970452 0070A ENSEMBLE D ANNEAU DE FIXATION 1 NUM ROS DE MOD LES RU101SS RU102SS RU107SS RU108SS RU109SS RU107ESS RU108ESS 6 M965907 FR 1 2 8 19 LIGNE D URGENCE Pour obtenir d...

Страница 13: ...URA DE COBRE o NPT de 1 2 ENTRADAS PEX DE 1 2 ASTM F1960 NPT de 1 2 PARED TERMINADA PARTE INFERIOR DE LA TINA OPCIONAL AL PISO TERMINADO NORMALMENTE ENTRE 65 Y 78 PARTE SUPERIOR DEL BORDE DE LA TINA 4...

Страница 14: ...ire el PROTECTOR DE YESO 8 nicamente cuando est listo para instalar el kit de chapet n n La pared terminada debe permitir una apertura de 4 de di metro Use el PROTECTOR DE YESO como gu a INSTALACI N E...

Страница 15: ...icionada en la pared delgada gire en sentido antihorario tal como se muestra en la Figura B para fijar el CUERPO DE LA V LVULA 2 en su lugar n Conecte los suministros de agua caliente y fr a seg n el...

Страница 16: ...OS DE MONTAJE 7 Nota La PLACA DE MONTAJE 4 los TORNILLOS DE MONTAJE 7 el PROTECTOR DEL CHAPET N 8 y los dos TORNILLOS 5 pueden encontrarse embalados con los accesorios Belshire en lugar de con la v lv...

Страница 17: ...de solo ducha descargar primero la l nea de agua fr a en la Orientaci n A Luego revertir a la Orientaci n B y descargar la l nea de agua caliente Alternativamente se puede retirar el tap n de descarga...

Страница 18: ...970451 0070A CIERRE DEL DESTORNILLADOR N MERO DE MODELO RU101SS RU102SS RU107SS RU108SS RU109SS RU107ESS RU108ESS 6 M965907 SP 1 2 8 19 L NEA DE AYUDA DIRECTA Si desea obtener informaci n o tiene preg...

Отзывы: