American Standard RU101SS Скачать руководство пользователя страница 1

- 1 -

M965907 Rev. 1.2 (8/19)

Product names listed herein are trademarks of AS America, Inc.
© AS America, Inc. 2019

Thank you for selecting American-Standard...
the benchmark of fine quality for over 140 years.

To ensure that your installation proceeds smoothly-please  
read these instructions carefully before you begin.

RECOMMENDED TOOLS

ROUGHING-IN DIMENSIONS 

n

  

To assure proper positioning in relation to wall, 
note roughing-in dimensions. 

INSTALLATION

INSTRUCTIONS

RU101SS

RU102SS

RU107SS

RU108SS

RU109SS

RU107ESS

RU108ESS

Tubing Cutter

Adjustable Wrench

Channel Locks

Flat Blade Screwdriver

Plumbers' Putty or Caulking

Phillips Screwdriver

101 mm

(4")

89 mm

(3-1/2")

RU102SS

RU101SS

92 mm

(3-5/8")

123 mm

(4-7/8")

120 mm

(4-3/4")

150 mm

(5-7/8")

RU108SS

RU107SS

RU107ESS

92 mm

(3-5/8")

166 mm

(6-1/2")

RU109SS

92 mm

(3-5/8")

168 mm

(6-5/8")

OUTLETS

1/2" NOM.

COPPER SWEAT

or 1/2" NPT

92 mm

(3-5/8")

126 mm

(4-7/8")

INLETS

1/2" PEX

(ASTM F1960)

OUTLETS

1/2" NOM.

COPPER SWEAT

or 1/2" NPT

INLETS

1/2" NOM. CPVC

92 mm

(3-5/8")

126 mm

(4-7/8")

OUTLETS

1/2" NOM.

COPPER SWEAT

or 1/2" NPT

INLETS

1/2" PEX

(ASTM F1807-2)

RU108ESS

92 mm

(3-5/8")

166 mm

(6-1/2")

OUTLETS

1/2" NOM.

COPPER SWEAT

or 1/2" NPT

INLETS

1/2" PEX

(ASTM F1960)

1/2" NPT

FINISHED WALL

BOTTOM OF TUB

TOP OF

TUB RIM

4"

(102 mm)

1/2"  NPT

7/8" TO 2"

(22 TO 50 mm)

2-3/4" MAX. (69 mm)

1-3/4" MIN. (45 mm) 

OPTIONAL TO

FINISHED

FLOOR USUALLY

BETWEEN

65'' AND 78''

OUTLETS

1/2" STUB OUT

INLETS

1/2" STUB OUT

OUTLETS

1/2" NOM.

COPPER SWEAT

OR 1/2" NPT

INLETS

1/2" NOM.

COPPER SWEAT

OR 1/2" NPT

OUTLETS

1/2" NOM.

COPPER SWEAT

or 1/2" NPT

INLETS

1/2" PEX

(ASTM F1807-2)

PLASTER

GUARD

NOTE: TO AVOID SHOWER RISE OR

OTHER RELATED ISSUES, 

DO NOT

USE 

PEX

 CONNECTIONS AT THE TUB

OUTLET CONNECTING TO THE TUB

SPOUT.

Flash

 Shower Valve Rough 

With Screwdriver Stops

Содержание RU101SS

Страница 1: ...3 5 8 166 mm 6 1 2 RU109SS 92 mm 3 5 8 168 mm 6 5 8 OUTLETS 1 2 NOM COPPER SWEAT or 1 2 NPT 92 mm 3 5 8 126 mm 4 7 8 INLETS 1 2 PEX ASTM F1960 OUTLETS 1 2 NOM COPPER SWEAT or 1 2 NPT INLETS 1 2 NOM C...

Страница 2: ...onnection method of selected valve n Connect RISER PIPE 1 to VALVE BODY 2 top outlet marked UP n Connect TUB FILLER PIPE 3 to bottom outlet n Install PLASTER GUARD 8 back onto the valve Only remove PL...

Страница 3: ...sure to position the Locking feature screw as shown in Figure A below Once the valve is positioned on the Thin Wall turn counterclockwise as shown in Figure B to secure VALVE BODY 2 in place n Connec...

Страница 4: ...n Holder 8 and the two SCREWS 5 can be found packaged with the Belshire Trim rather than the valve n Connect HOT and COLD water supplies per connection method of selected valve n Connect RISER PIPE 1...

Страница 5: ...r shower only installation flush cold supply line first in Orientation A Then reverse to Orientation B and flush hot supply line Alternatively the flush plug can be removed entirely to flush water thr...

Страница 6: ...RATELY RU108ESS RU109SS RU107ESS 1 2 1 2 1 2 3 3 3 4 4 4 MODEL NUMBERS RU101SS RU102SS RU107SS RU108SS RU109SS RU107ESS RU108ESS HOT LINE FOR HELP For toll free information and answers to your questio...

Страница 7: ...SORTIES 1 2 PO NOM BRASAGE DU CUIVRE OU FILETAGES NPT 1 2 PO ENTR ES 1 2 PO NOM CPVC OBTURATEUR DE PL TRAGE FILETAGES NPT 1 2 po MUR FINI BASE DE LA BAIGNOIRE FACULTATIF VERS LE PLANCHER FINI G N RAL...

Страница 8: ...semble de garniture n Le mur fini doit pouvoir accueillir une ouverture de 4 po de diam tre se guider l aide de L OBTURATEUR DE PL TRAGE INSTALLATION MURALE STANDARD ATTENTION Une fois le robinet inst...

Страница 9: ...faire tourner dans le sens antihoraire conform ment l illustration B pour fixer le CORPS DE ROBINET 2 n Raccorder les alimentations en eau CHAUDE et FROIDE en suivant la m thode correspondant au robi...

Страница 10: ...AGE 7 fermement Remarque Vous trouverez la PLAQUE DE MONTAGE 4 les VIS DE MONTAGE 7 le support de la PLAQUE DE FINITION 8 et les deux VIS 5 dans les emballages des garnitures Belshire plut t que dans...

Страница 11: ...la conduite d alimentation d eau froide avec l orientation A d abord Inversez ensuite la bonde l orientation B et purgez la conduite d alimentation d eau chaude Une autre fa on de proc der est d enle...

Страница 12: ...BOUCHON DE BRASAGE PO 2 M970452 0070A ENSEMBLE D ANNEAU DE FIXATION 1 NUM ROS DE MOD LES RU101SS RU102SS RU107SS RU108SS RU109SS RU107ESS RU108ESS 6 M965907 FR 1 2 8 19 LIGNE D URGENCE Pour obtenir d...

Страница 13: ...URA DE COBRE o NPT de 1 2 ENTRADAS PEX DE 1 2 ASTM F1960 NPT de 1 2 PARED TERMINADA PARTE INFERIOR DE LA TINA OPCIONAL AL PISO TERMINADO NORMALMENTE ENTRE 65 Y 78 PARTE SUPERIOR DEL BORDE DE LA TINA 4...

Страница 14: ...ire el PROTECTOR DE YESO 8 nicamente cuando est listo para instalar el kit de chapet n n La pared terminada debe permitir una apertura de 4 de di metro Use el PROTECTOR DE YESO como gu a INSTALACI N E...

Страница 15: ...icionada en la pared delgada gire en sentido antihorario tal como se muestra en la Figura B para fijar el CUERPO DE LA V LVULA 2 en su lugar n Conecte los suministros de agua caliente y fr a seg n el...

Страница 16: ...OS DE MONTAJE 7 Nota La PLACA DE MONTAJE 4 los TORNILLOS DE MONTAJE 7 el PROTECTOR DEL CHAPET N 8 y los dos TORNILLOS 5 pueden encontrarse embalados con los accesorios Belshire en lugar de con la v lv...

Страница 17: ...de solo ducha descargar primero la l nea de agua fr a en la Orientaci n A Luego revertir a la Orientaci n B y descargar la l nea de agua caliente Alternativamente se puede retirar el tap n de descarga...

Страница 18: ...970451 0070A CIERRE DEL DESTORNILLADOR N MERO DE MODELO RU101SS RU102SS RU107SS RU108SS RU109SS RU107ESS RU108ESS 6 M965907 SP 1 2 8 19 L NEA DE AYUDA DIRECTA Si desea obtener informaci n o tiene preg...

Отзывы: