background image

- 2 -

1

2

ROUGHING-IN

INSTALL COLD WATER SUPPLY

• Install a 2x6 

Cross Brace 

within the wall between the 

Wall Studs

.

• Determine the supply height from the finished floor and drill a 7/8 inch dia. hole at that location.

•  Install the 1/2" NPT cold water supply. Secure supply pipe to the Cross Brace. 

Important: The supply pipe must extend 1/2" from the face of the finished wall

• Finish installing the wall board and the finished wall.

M985014 (3/19)

CAUTION

Turn off hot and cold water 

supplies before beginning.

2X6 CROSS BRACE

7/8"DIA. HOLE

WALL BOARD

FINISHED WALL

FINISHED WALL

OPTIONAL TO

FINISHED FLOOR

2X6 CROSS BRACE

DRILL 7/8"

DIA. HOLE

WALL STUDS

16"

FINISHED WALL

1/2"

1/2"

 

NPT

SUPPLY

WALL BOARD

FINISHED WALL

SUPPLY NIPPLE

PIPE BRACE

Отзывы: