42
Pub. No. 12-5027-01
69-1615
Leave
Return
Sleep
Run
Program
7.
Press
Leave
,
Return
or
Sleep
and repeat steps 3, 4, 5 and 6 for programming the rest of the
day. The day is now programmed (first day of a seven-day schedule).
IMPORTANT
Repeat steps 1 through 7 for each day of the week that has a different schedule from the
first day. Or, refer to the section
Copying a Day
to copy any programmed day to another.
8.
Press
Run Program
to return to normal operation.
Pressed the wrong key?
Want to start over?
Don’t worry! You can always press
to return display to normal.
Run
Program