background image

Operate LIFT KNOB 

(1)

 to verify that STOPPER 

(2) 

opens and

closes.

Note: 

If STOPPER 

(2)

 does not open and close properly then

refer to the “troubleshooting section” of these instructions.

CHECK OPERATION OF POP-UP

8

9

Thread CABLE CONNECTOR 

(1) 

clockwise

onto DRAIN BODY CONNECTION 

(2)

 and

hand tighten. 

Fig.

 

A.

Your new POP-UP DRAIN installation is
now complete. 

Fig.

 

B.

Note: 

Tailpeice on pop-up drain is 1-1/4” O.D.

Fig.

 

B.

Fig.

 

A.

ATTACH CABLE CONNECTOR

7

2

1

Fig.

 

B.

1-1/4” O.D.

3

2

1

Connect HOT water supply to inlet of left SHANK and COLD
water supply to right SHANK using sealant, appropriate
connectors, and COUPLING NUTS.

Connect 1-1/4” O.D. TAILPIECE 

(4)

 on POP-UP

DRAIN to 

“p” trap.

9

Connect water supply to INLET SHANKS 

(1)

 with 1/2" IPS

FLEXIBLE SUPPLIES 

(2)

 or 3/8" O.D. BULL-NOSE RISERS 

(3)

.

Use adjustable wrench to tighten connections. Do not over
tighten. Be careful not to kink copper supply when bending.
Use tubing cutter to cut to proper length.

MAKE WATER SUPPLY AND WASTE CONNECTIONS

NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED

AND MUST BE PURCHASED SEPARATELY.

HOT

COLD

FERRULE

COMPRESSION

NUT

COUPLING

NUT WITH 

FAUCET

COUPLING

NUT ON FLEX

SUPPLIES

FLEXIBLE

SUPPLIES

1

3/8 O.D.

BULL-NOSE

RISERS

3/8 COMPRESSION

CONNECTION

2

3

4

“P” TRAP

M 9 6 8 8 7 6   R e v.   1 . 2        

Отзывы: