754474-100 Rev. A

3

ROUGH-IN CHART FOR BATH MODEL

MODEL

NUMBER

DIMENSIONS

ACTUAL UNIT SIZE

WIDTH 

LENGTH

HEIGHT

WEIGHT

A

B

C

D

E

Rough-in Details

Framing and installation

E

A

*D

B

TU

B W

ID

TH

LEVELING
STRINGERS

*C

Alcove Installation

“C” AND “D” ARE FOR BATH

   DRAIN LOCATIONS ONLY. 

1713

60"

1524mm

31"

787mm

15-1/2"

394mm

7-1/2"

190mm

21-3/4"

552mm

23"

584mm

60"

1524mm

33-3/4"

857mm

81 lbs.

37 Kg

Locate studs as required. Ensure rough dimensions are proper, plumb and square.

The following procedure must be used for all installations: stringer height should be as indicated.

The sump of the bath is supported by wood runners and no additional sump support is required.

Once the bath is in place, the runners should be shimmed accordingly, so that the rim of the bath contacts the stringer or pier but 
supports no weight.

Any finish material, such as tile or wall board, must be self-supporting if it contacts the rim of the bath.

NOTE:

BUILDING MATERIALS AND
WIRING SHOULD BE ROUTED  
AWAY FROM THE AIR PUMP BODY.

SUGGESTED INSTALLATION METHOD

STUD

WATER PROOFING DRYWALL
OR CEMENT BOARD

TILE

SEALANT

TUB

ROOFING NAIL

25x76mm (1x3) WO O D

STRINGER FULL LENGTH

STEEL
STUD

TUB

4" (102mm)
DRYWALL
SCREW

STEEL STUDS

WASHER

WATER PROOFING DRYWALL
OR CEMENT BOARD

TILE

SEALANT

SECURE THE BATH TO THE STUDS AS SHOWN FOR WOOD OR STEEL STUD CONSTRUCTION

WOOD STUDS

25x76mm (1x3) WO O D

STRINGER FULL LENGTH

Plumbing

• CONSULT A QUALIFIED PLUMBER TO HOOK-UP THE DRAIN/OVERFLOW PLUMBING TO THE HOUSE WASTE SYSTEM.     

  USE INSTRUCTION SUPPLIED WITH DRAIN AND OVERFLOW.

Deck-mounted Faucet:

For deck-mounted faucet and fill spout, use a hole saw for drilling. Apply masking tape to protect the surface prior to drilling to avoid damage. Follow the 
manufacturer’s instructions for spacing and size of holes to be drilled. Be sure to locate the fill spout so that the flow of water does not strike handles or other 
surfaces which may cause the water to splash. The plumbing for the faucet and fill spout should not be allowed to interfere with the airbath equipment.

Testing:

It is important to remove all construction debris to ensure that the bath is clean before testing.

Be sure to test the airbath after the electrical and plumbing are complete, before enclosing the bath and completing the surroundings. This test ensures that 
no damage occurred during shipment or installation and that the installation is satisfactory. Failure to do this will affect your warranty coverage.

Fill the bath and allow the water to stand for 30 minutes. Check the drain and waste/overflow for leaks. Turn on the airbath jets and run for 20 minutes. 
Check for leaks while system is under pressure.