StorTrends® 2401 Setup Guide
3
Hardware Installation
Overview
This section provides a quick setup checklist to get your StorTrends® 2401 storage
appliance up and running. Following the steps in the order given should enable you to
have the system operational within a minimal amount of time.
NOTE:
Follow the steps in the order given to complete the installation process in a minimal
amount of time. Read this section in its entirety before you begin the installation
procedure outlined in this section.
Unpack the StorTrends® 2401 Storage Appliance
You should inspect the box the StorTrends® 2401 Storage Appliance was shipped in and
make sure that it is undamaged. If the server itself shows damage, you should file a
damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the StorTrends® 2401
Storage Appliance. It should be situated in a clean, dust-free area that is well ventilated.
Avoid areas where heat, electrical noise and electromagnetic fields are generated. You
will also need it placed near a grounded power outlet. Read all
Warning
sections in this
document.
Содержание StorTrends 2401
Страница 12: ...StorTrends 2401 Setup Guide 12 Slide System into Enclosure ...
Страница 45: ...StorTrends 2401 Setup Guide 45 ...