![American Lighting LED HYBRID 2 120-H2 Series Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/american-lighting/led-hybrid-2-120-h2-series/led-hybrid-2-120-h2-series_installation-instructions_2924671002.webp)
PAGE 2 OF 2
RV1615
www.americanlighting.com
Figure 2
Figure 3
Line up the barbed ends of the power
pin with the wires inside housing and
push pins in, making solid contact.
Match the barbed side of the power
pin with the direction of the "Δ" when
connecting power.
Cutting increments are
located every 18”,
designated by a “Δ” on
the top of the housing.
Figure 4
Pin assembly
Power cord sheath
Shrink tube
CONNECTING POWER CONNECTION KIT (SEE FIGURES 2, 3, AND 4)
NOTE: Do not exceed 150ft maximum run distance in any single run.
For outdoor use, apply silicone when making power connection and attaching end cap.
Secure attached power cord by tightening threaded collar to Hybrid 2 before installing.
1. Determine the required length for flexible light.
2. Cut the Hybrid 2 squarely at the nearest cut mark using a sharp rope light cutting tool
or shears. See Figure 2. NOTE: Hybrid 2 is wired in parallel with 18” cutting increments.
Cutting anywhere other than the end/beginning of a cutting increment will damage an
LED and/or internal wiring.
3. Holding the smooth pins of the power pin with a pair of pliers, line up the barbed pins
with the two wires of the flexible light. Push barbed pins into Hybrid 2 until flush, being
sure to make solid contact with the flexible light’s internal wires. See Figure 3.
4. Slide the shrink tube over power cord sheath. See Figure 4.
5. Push the power cord sheath onto the assembly until fully seated and slide the heat shrink
tube over the power cord sheath so that it is centered over the junction of the Hybrid 2 and
the power cord sheath. See Figure 4.
6. Gently apply heat using a heat gun to seal the heat shrink over the connection.
7. Attach end cap to other end of flexible light to cover exposed dead end.
MOUNTING:
1. Use mounting clips included with the bulk reel (or order additionally H2-CLIPS, sold separately) or for straight line
applications, use H2-TRACK-3 mounting track (sold separately); or use a combination of methods. H2-CHAN-3 aluminum
channel is also available (sold separately).
2. Make sure that the distance between any two parallel runs of lighting are at least 1/2” apart.
3. Gently press flexible light into track or clips so that it snaps into place.
DO NOT TWIST, HANG VERTICALLY, SUSPEND UNSUPPORTED IN THE MIDDLE OR BEND ALONG SHORT SIDE:
PROP 65 WARNING:
Handling the coated electrical wires of this product exposes you to lead, a chemical known to the State of California
to cause cancer, birth defects and other reproductive harm. Wash hands after use.
LED HYBRID 2 BULK REELS
Installation instructions for 120-H2 Series
120V AC, 60Hz operation