9
NOTE:
Water column pressure requirements (measured at the pressure tap on the gas valve body):
Natural Gas - 3.5 Inches Water Column.
L.P. Gas - 10.5 Inches Water Column.
6. If computer program changes are required, refer to the Phase 6 OPL Operators Manual (
ADC
Part
No. 113022) for details.
7. The dryer
should be
operated through one complete cycle to assure that no further adjustments are necessary
and that
ALL
components are functioning properly.
8. Check the electric service phase sequence. While the dryer is operating, check to see if the blower wheel is
rotating in the proper direction. Looking from the front, the blower wheel should spin in the clockwise (CW)
direction. If so, the phasing is correct. If the phasing is incorrect, reverse two (2) leads at connections L1, L2,
or L3 of power supply to the dryer.