Ramp Guard Rails 

Our standard 42” high picketed ramp guard rail sizes: 2’, 3’, 4’, 5’, and 6’. We do not offer any length ramp guard rail outside 
of the aforementioned sections. 

 

Items needed for assembly: 

Proper length guard rails and RHP. 

1.  Confirm that all ramp sections are set at a 1:12 slope before installing ramp guard rails. 

Ramp guard rails are welded at 

a 1:12 slope to match the pre-welded slope of the ramp sections. If the ramp sections are not set at a 1:12 slope, the 
guard rails will not properly slide over the supports and inserts. The guard rails will also get into a bind or will have to 
much space between the ramp guard rail and platform guard rail, and the 5” bolts will not be long enough to secure 
the two guard rails together if the ramp sections are not set at a 1:12 slope.

 

2.  Determine the proper length guard rail based on the length of ramp section being worked on.  
3.  Slide each vertical post at either end of the guard rail over the support tubing and/or insert extending 10” above the 

ramp section support sockets until the guard rails rest directly on top of the ramp section support socket. 

4.  Each section of guard rail installed should align black cap to black and bolt hole to bolt hole with the previous guard rail.  
5.  Continue this procedure throughout the system until all ramp sections have guard rails.  

6. 

When installing the last section of ramp guard rail, a right and left commercial loop will be installed on the inside      
vertical post at the bottom right and bottom left part of the last section of guard rail. 

Use the hand rail bracket 

mounting hole to mount the commercial loop on the inside vertical post of the bottom last section of ramp guard rail.  

Due to the ramp guard rails being welded at a 1:12 slope, they can only be installed one way. The 
high end of the rail will always be positioned at the top of the ramp section. 
All ramp guard rails will come with pre-drilled hand rail bracket mounting holes located in the middle 
portion of the rail vertical post.  
Additional screws, bolts, and nuts will be added later to secure rails in place. 

Содержание Entrada Series

Страница 1: ......

Страница 2: ...Metal wood drill bits Rubber mallet 30 Tape measure 48 Level optional 36 level for horizontal ramp leveling Torpedo laser level for finding ground variance Concrete screws anchors and asphalt bolts L brackets Table of Contents Platform and Ramp Description Hardware Packages Tongue and Groove Design Platform Assembly Ramp Assembly Platform Guard Rails and Closures Ramp Guard Rails Hand Rails Bracke...

Страница 3: ... Picket Guard Rail 42 Picket Guard Rail for 4 x48 Ramp Section 2 units per section 5ft Picket Guard Rail 42 Picket Guard Rail for 5 x48 Ramp Section 2 units per section 6ft Picket Guard Rail 42 Picket Guard Rail for 6 x48 Ramp Section 2 units per section ACCESSORIES TPCOM Commercial Ramp Transition Plate 9 25 deep x 45 25 wide connects platform to building TP Modular Ramp Transition Plate 9 5 deep...

Страница 4: ...used to connect the top of the loop to the ramp and platform guard rails 2 3 8 SS Nut 4 3 8 SS Flat washer 2 14 x 1 Tek Screw SS 3 8 hex head 2 5 8 Black plug used to fill open bolt holes 90H 90 Degree Hardware Pack one per 90 used to create a 90 connection from hand rail to hand rail 1 Aluminum 90 elbow used to connect hand rail to hand rail 2 Aluminum insert used to connect the elbow to the hand...

Страница 5: ...ease of being able to connect platform to platform platforms will always tongue and groove when being paired together platform to ramp ramp to ramp and ramp to stop and rest by simply placing the tongue male end into the groove female end Both ramp and platform sections are engineered with the tongue and groove located at opposite ends of the section Ramp sections specifically are engineered with ...

Страница 6: ...e facing the direction of the first ramp section or connecting platform then make height and level adjustments as needed 5 Check to confirm 75 bolts are secure in corner support sockets 6 Assemble all platforms and supports in this manner Guard rails and hand rails will be installed after all platforms and ramps are assembled and set 7 Use a TPCOM transition plate commercial or TP transition plate...

Страница 7: ...wo until the foot pads are touching the bottom of the support sockets and lightly tighten The raised supports will be lowered later 3 Place the tongue side of platform two into the groove side of platform one Platform one will support platform two The tongue side supports on platform two will be lowered in the next step Make height and level adjustments as needed Platform one and platform two need...

Страница 8: ...Assemble the ramp section in the same manner as described above If using a tongue and groove connection with the platform the ramp section will need 2 supports and 2 inserts 2 Secure 2 supports in the bottom ramp sockets groove end at the approximate height to meet a 1 12 slope and 14 inserts into the top sockets tongue end The bottom of the insert should be held flush with the bottom of the ramp ...

Страница 9: ...orts The bottom of the section will fall directly on the ground 5 The TT48 48 transition tread 12 deep x 1 high will slide from the side onto the groove part of the bottom of the last section of ramp Center the TT48 with the last section of ramp 6 Assemble the stop rest level landing after 30 of run like assembling a platform The stop and rest will be treated like a ramp section in relation to how...

Страница 10: ...he end resting on the platform should be aligned with the adjacent support One side of the 63U will always slide over a 10 piece of support tubing that extends above the walking surface of the platform and the other end will always rest on the platform Never attempt to make a 63U slide over two corner supports it will not slide over them and the supports will have to be cut off in order to free up...

Страница 11: ...3 above The larger closure support to stabilizer once installed should run from a corner support to a stabilizer aligning vertically with existing ramp guard rail 5 The 11 3 16 closure smaller closure stabilizer to stabilizer will be used on a 90 platform and potentially on custom systems where needed 6 Place the smaller stabilizer to stabilizer closure next to the existing larger closure creating...

Страница 12: ...d rail over the support tubing and or insert extending 10 above the ramp section support sockets until the guard rails rest directly on top of the ramp section support socket 4 Each section of guard rail installed should align black cap to black and bolt hole to bolt hole with the previous guard rail 5 Continue this procedure throughout the system until all ramp sections have guard rails 6 When in...

Страница 13: ...locate the bolt hole The bolt hole for the loops will be at the same height as the hand rail bracket bolt holes approximately 28 5 from the base of the post 2 Place the welded spacer located at the top inside of the loop post over the bolt hole in the guard rail Place a 3 8 SS washer on a 3 8 16 5 SS bolt and insert it into the loop post through the spacer through the guard rail post until the thr...

Страница 14: ...kets Installing Hand Rails Hand rail installation always begins with the loops at the bottom of the ramp and works up the system until complete 1 Take 1 5 aluminum insert and place 1 black O ring in the middle Then slide the insert into the top opening of the loop This loop to hand rail connection is made only with the first loops of the system 2 Based off of the length of ramp section determine t...

Страница 15: ...form until platform connections are complete Final Ramp Hardware 1 Slide 1 3 8 16 5 SS bolt with 1 SS washer through bolt holes from guard rail to guard rail Secure with 3 8 SS washer and nut Hand tighten 2 Repeat this process throughout the system unilaterally until each ramp guard rail is connected to the previous guard rail Securing All Hardware 1 Start at the top of the system and use the impa...

Страница 16: ...se products Final Check of Installed System Ensure that all hardware is in place and secure Walk on the installed system and check for any unstableness or loose rails Remove any debris left from installation Warning Failure to install according to these instructions will void the warranty and could result in serious injury Do not exceed load rating In wet or icy conditions ramp may become slippery...

Страница 17: ...17 ...

Страница 18: ...18 ...

Отзывы: