-
26
-
9. Taking Out the Load
●
When salt water, salt media, and other liquid with a high
concentration of salt boil over inside the chamber, drain water
from the chamber and wipe the area around the gasket cleanly,
otherwise the chamber and piping will be corroded, causing
explosion.
●
Open the lid after confirming that the pressure in the chamber
has dropped to "0 MPa" .
●
Keep the face and hands away from the chamber when lifting the lid after operations are
completed; steam will gush out of the opening of the chamber.
●
After operation is over, the lid, chamber, packing and panel are hot. To protect yourself from
burns, do not touch with bare hands.
●
It takes a lot of time for the liquid to cool. Be sure to check that the temperature has dropped
sufficiently before unloading the liquid from the chamber, or you may get burned.
●
If the liquid surface which is placed in the chamber is covered with oil, etc, the liquid may gush
out when taking out or carrying. Be sure to check that the temperature has dropped sufficiently
before unloading the liquid from the chamber or it may cause burns.
●
Put on heat insulation gloves before taking objects out of the chamber. Do not put your hands
into the chamber until the steam has been vented.
①
Press the "LID OPEN" switch.
・
When the display is red, the lid cannot be opened.
②
Take out the load.
③
Press the "LID CLOSE" switch.
・
When the temperature inside the chamber is high, the cooling fan will run until the temperature
drops enough to unlock the lid safely. The air leaking from the chamber will make a hissing sound,
which is not failure. Continue operation. Lid will not be closed just in case the lid is not opened
completely.
・
Press “LID OPEN” switch and press the “LID CLOSE” switch again after the Lid has been opened
completely.
WARNING
Pressure
gauge
0.2
0.3
0.4
0
0.1
0
CAUTION
Содержание Hirayama HG-50
Страница 8: ... 7 HG 80 External View ...