User Manual
8
2. Installation
2-1. Starting 24-Port GbE Web Smart Switch Up
This section describes how to install the Web Smart Switch and its components,
and it includes the following information:
-
Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
At the beginning, please do first:
⇒
Wear a grounding device to avoid the damage from electrostatic discharge
⇒
Be sure that power switch is OFF before you insert the power cord to power
source
•
Installing Optional SFP
Fiber Transceivers to the
24-Port GbE Web Smart
Switch
Note: If you have no modules, please skip this section.
•
Connecting the SFP Module to the Chassis:
The optional SFP modules are hot swappable, so you can plug or unplug it
before or after powering on.
1. Verify that the SFP module is the right model and conforms to the chassis
2. Slide the module along the slot. Also be sure that the module is properly
seated against the slot socket/connector
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
slot(s)
5. Have the power ON after the above procedures are done
Fig. 2-1 Installation of Optional SFP Fiber Transceiver
Содержание SGR24W4
Страница 1: ...SGR24W4 24 port Gigabit Web Smart Switch with 4 combo RJ45 SFP ports User s Guide Release 1 05...
Страница 28: ...User Manual 22 Fig 2 12 Office Network Connection Fig 2 11 Peer to peer Network Connection...
Страница 82: ...User Manual 76 Fig 4 24 Filter Configuration...
Страница 95: ...User Manual 89 Fig 4 31 RSTP Status...
Страница 111: ......