![Amer.com SR24 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/amer-com/sr24/sr24_user-manual_2921988010.webp)
6
U
NPACKING AND
I
NSTALLATION
This chapter provides unpacking and setup information for the
Switch.
Unpacking
Open the shipping carton of the Switch and carefully unpack its contents.
The carton should contain the following items:
9
The 24-port 10/100Mbps Fast Ethernet Switch
9
One AC power cord, suitable for your area’s electrical
power connections
9
Four rubber feet to be used for shock cushioning
9
Screws and two mounting brackets
9
This User’s Guide
If any item is missing or damaged, please contact supplier for replacement.
Installation
The site where you install the Switch stack may greatly affect its
performance. When installing, consider the following pointers:
Install the Switch in a fairly cool and dry place. See
Specifications
for the
acceptable temperature and humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field generators
(such as motors), vibration, dust, and direct exposure to sunlight.
Leave at least 10cm of space at the front and rear of the unit for ventilation.
Install the Switch on a sturdy, level surface that can support its weight, or in
an EIA standard-size equipment rack. For information on rack installation,
see the next section,
Rack Mounting.
When installing the Switch on a level surface, attach the rubber feet to the
bottom of the device. The rubber feet cushion the unit and helps protect the
case from scratching.