background image

6

“FPER2” and “FPERSR” - Installation and Maintenance manual

TECHNICAL FEATURES

Max suction pipe lenght

   

1,5 meters

Environment temperature:

  

 0 ÷ 45°C (32 ÷ 113°F)

Chemical  Temperature:

   

0 ÷ 50°C (32  ÷ 122°F)

CONSTRUCTION MATERIALS

Case:

                 PP

Valve Balls:

 GLASS, PTFE (upon demand)

Suction pipe:

 PVC

Delivery pipe:

 PVC

Valve body :

 PP/PVDF (upon demand)

Injection valve:

 PP V-706 (glass ball, HASTELLOY C276 spring).

Foot Filter:

               PP/PVDF (upon demand)

PROVIDED ACCESSORIES

n.2

Dibbles  ø6

n.2

Screws 4,5 x 40

n.1

Fuse  5 X 20 delaied

n.1

Foot filter/valve assy

n.1

Injection valve

m 4

PVC suction and delivery hose

n.1

Instruction manual

Содержание FPER

Страница 1: ...1 FPER2 and FPERSR Installation and Maintenance manual 1 FPER FPER2 and FPERSR Metering Pumps 1 01 Installation and Maintenance...

Страница 2: ...irective Directiva de baja tensi n Direttiva EMC Compatibilit Elettromagnetica EMC electromagnetic compatibility directive EMC directiva de compatibilidad electromagn tica Pump must be accessible at a...

Страница 3: ...ipe should be as short as possible in vertical position without any bendes to avoid air bubbles Install the injection valve and connect it to the pump head To avoid breaking of delivery pipe be sure t...

Страница 4: ...to an inductance load like motors to prevent electronic circuitry damages Always usa a connector to cut off spikes due to other devices switching Dosing pump in parallel connection with inductive loa...

Страница 5: ...he chemical manifacturer when entering in direct contact with it FPER FPER2 AND FPERSR type pump need small maintenance clear once per year all the valves and the foot filter If high chrystallizing pr...

Страница 6: ...ION MATERIALS Case PP Valve Balls GLASS PTFE upon demand Suction pipe PVC Delivery pipe PVC Valve body PP PVDF upon demand Injection valve PP V 706 glass ball HASTELLOY C276 spring Foot Filter PP PVDF...

Страница 7: ...lation and Maintenance manual FPER FPER2 Series Description Turn On Off Switch Status Led Pause Time Adjustment Knob Dosing Time Adjustment Knob Turn On Off Switch Status Led Dosing Activity Switch Do...

Страница 8: ...ies to the following standards EC RULES STANDARD EC Low Voltage Directive 2006 95 CE EMC electromagnetic compatibility directive 2006 42 CE EUROPEAN HARMONIZED STANDARDS UNDER DIRECTIVE EN 12100 1 EN...

Страница 9: ...CE Direttiva Basso Voltaggio 2006 95 CE Direttiva EMC Compatibilit Elettromagnetica 2006 42 CE NORME ARMONIZZATE EUROPEE NELL AMBITO DELLA DIRETTIVA EN 12100 1 EN 12100 2 Sicurezza sul macchinario EN...

Страница 10: ...ses tension 2006 95 CE Directive sur la compatibilit lectromagn tique 2006 42 CE normes europ ennes harmonis es EN 12100 1 EN 12100 2 S curit des machines EN 809 Pompes et groupes motopompes pour liqu...

Страница 11: ...CE Directiva de baja tensi n 2006 95 CE EMC directiva de compatibilidad electromagn tica 2004 108 CE NORMAS EUROPEAS ARMONIZADAS CONFORME A LA DIRECTIVA EN 12100 1 EN 12100 2 Seguridad de las m quina...

Страница 12: ...8 FPER2 and FPERSR Installation and Maintenance manual...

Отзывы: