![Amazone AMASET+ Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/amazone/amaset/amaset_operators-manual_2919815010.webp)
Putting into operation
10
BAG0007.4 08.16
5
Putting into operation
In his chapter you will find information for putting your machine into
operation.
DANGER
Before putting the machine into operation ensure that the opera-
tor has read and understood the operator's manual.
DANGER
Please also refer to the operator's manual for the field sprayer!.
5.1
Initial operation
•
Setting the equal pressure valve chest (see Seite 11)
5.2
AMASET
+
- connection
•
Connect the implement plug on
AMASET
+
.