background image

Part 2 – Attaching the Projector to the Mount

XXXX-20181008

1

Swivel adjustment can be made by simply turning your 
projector in the desired direction (see Fig. 16).

OPERATION AND ADJUSTMENT 

Examine the mounting holes on 
the back of your projector to 
determine the extension arm 
needed or not.You may need to 
remove the fixing screw on the 
extension arm to shorten the 
extension arm for smaller 
projector(see Fig. 11).

1

Hook the mount base with your projector attached onto the 
mount body. Tighten the M5 x 10 screws 

(

E

on the sides of 

the mount base to hold it in place (see Fig. 15).

1

Attach your projector to the mount arms as shown using the 
appropriate screw from the hardware kit (C, D,  F and G) (see 
Fig. 13)

3

Attach the mount arms to the mount base as shown using the 
M6 x 12 screws (G) and M6 washer (K) from the kit. Attach one 
mount arm into each slot in the mount base (see Fig. 12). 
Leave the screws loose enough so that the arms can be 
moved when attaching the projector.  

2

Tighten the M6 x 12 screws (G) used to attach the arms to the 
mount base in step 1 (see Fig. 14).

NOTE:

 If you cannot find a screw from the 

provided hardware kit that fits, consult the 

manufacturer of your display for the 

proper size.

Part 2 – Attaching the Projector to the Mount (continued)

Part 3 – Assembling the Mount

4

2

3

Attach the M5 large washer (L) 

to the Mount Body using the M5 

x 10 screw (E) from the kit (see 

Fig. 7). Leave the screw loose 

enough so that the mount can 

be hooked onto the mount 

body.  
After you have determined your 
desired Projector location, Place 
the ceiling plate over the joist 
and mark two locations for 
securing the plate to the ceiling. 

4

5

6

Set the ceiling plate aside and 
drill two holes 3”(76mm) deep 
using a 5/16”(or 8mm) size drill 
bit at each marked location (see 
Fig. 8).
Insert concrete anchors (B) into 
each hole so that it is flush with 
the concrete surface. A hammer 
can be used to lightly tap the 
anchors into place if necessary 
(see Fig. 9).
Install the Ceiling Plate using 
two Lag Bolts (A) in the “A” and 
“B” holes. Do not over tighten lag Bolts (see Fig. 10).

Part 1B – Mounting to the Ceiling (Concrete)(continued)                                                

 

 

(G)

(C or D or F)

(I or H) 

C

I

D

I

F

H

(E)

(A)

 

360°

2

Tilt adjustments can be made by loosening the screws on 
both sides of the ceiling plate and  mount base, moving the 
projector to the desired angle, and then re-tightening the 
screws (see Fig. 17).

3

Periodically clean your mount with a dry cloth. Inspect all 
screws and hardware at regular intervals to ensure that no 
connections have become loose over time. Re-tighten as 
needed.

±15°

±15°

Fig. 8

Fig. 9

Fig. 10

Fig. 11

(G)

(K)

Fig. 12

Fig. 13

Fig. 14

Fig. 15

Fig. 17

Fig. 16

(E)

(L)

Fig. 7

Отзывы: