4
1. Disconnect all power to the furnace. Do not touch
the integrated control module or any wire connected
to the control prior to discharging your body’s
electrostatic charge to ground.
2. Firmly touch a clean, unpainted, metal surface of the
furnaces near the control. Any tools held in a person’s
hand during grounding will be discharged.
3. Service integrated control module or connecting
wiring following the discharge process in step 2.
Use caution not to recharge your body with static
electricity; (i.e., do not move or shuffle your feet, do
not touch ungrounded objects, etc.). If you come in
contact with an ungrounded object, repeat step 2
before touching control or wires.
4. Discharge your body to ground before removing a
new control from its container. Follow steps 1 through
3 if installing the control on a furnace. Return any old
or new controls to their containers before touching
any ungrounded object.
To The Installer
Before installing this unit, please read this manual
thoroughly to familiarize yourself with specific items which
must be adhered to, including but not limited to: unit
maximum external static pressure, gas pressures, BTU
input rating, proper electrical connections, circulating air
temperature rise, minimum or maximum CFM, and motor
speed connections.
WARNING
To prevent property damage, personal injury or death due
to fire, do not install this furnace in a mobile home, trailer,
or recreational vehicle.
PRODUCT DESCRIPTION
Features
The *MEC96 furnace may be installed upflow or
horizontally with left or right side down. The *CEC96
furnace may be installed downflow or horizontally with
left or right side down. *MEC96 & *CEC96 two-stage gas
furnaces features a multi-speed ECM indoor fan motor,
two heating inputs (W1 & W2), two cooling inputs (YLO
& Y) and a two stage gas valve. A single stage heating
thermostat may also be used in conjunction with timed
transition to high fire by the furnace integrated control
board.
PRODUCT APPLICATION
This furnace is primarily designed for residential home-
heating applications. It is
NOT
designed or certified for
use in mobile homes, trailers or recreational vehicles.
Neither is it designed or certified for outdoor applications.
The furnace
must
be installed indoors (i.e., attic space,
crawl space, or garage area provided the garage area is
enclosed with an operating door).
This furnace can be used in the following non-industrial
commercial applications:
Schools, Office buildings, Churches, Retail stores,
Nursing homes, Hotels/motels, Common or office
areas
In such applications, the furnace must be installed with the
following stipulations:
•
It must be installed per the installation instructions
provided and per local and national codes.
•
It must be installed indoors in a building constructed
on site.
•
It must be part of a ducted system and not used in a
free air delivery application.
•
It must not be used as a “make-up” air unit.
•
It must be installed as a two-pipe system for
combustion air.
•
All other warranty exclusions and restrictions apply
This furnace is an ETL dual-certified appliance and
is appropriate for use with natural or propane gas
(
NOTE:
If using propane, a propane conversion kit is
required).
Dual certification means that the combustion air inlet pipe
is optional and the furnace can be vented as a:
•
Non-direct vent (single pipe) central forced air furnace
in which combustion air is taken from the installation
area or from air ducted from the outside or,
•
Direct vent (dual pipe) central forced air furnace in
which all combustion air supplied directly to the
furnace burners through a special air intake system
outlined in these instructions.
This furnace may be used as a construction site heater
ONLY
if all of the following conditions are met:
•
The vent system is permanently installed per these
installation instructions.
•
A room thermostat is used to control the furnace.
Fixed jumpers that provide continuous heating
CANNOT be used and can cause long term
equipment damage. Bi-metal thermostats, or any
thermostat affected by vibration must not be used
during construction.
•
Return air ducts are provided and sealed to the
furnace.
•
A return air temperature range between 60ºF (16ºC)
and 80ºF (27ºC) is maintained.
•
MERV 11 (Example P/N AMP-11-2025-45) air filter(s)
are installed in the system and inspected daily and
replaced as needed during construction and upon
completion of construction.
•
The input rate and temperature rise are set per the
furnace rating plate.
•
The furnace must be installed as a two pipe system,
using 100% outside air for combustion during
construction.
Содержание *MEC96
Страница 59: ...59 THIS PAGE IS LEFT INTENTIONALLY BLANK ...