A
1C-5 Install the side frames using lag screws [D]. Tighten the lag screws [D] only until they are pulled
firmly against the wall.
Step 2 Secure the Boards [A] to the Side Frames [B]
[Not Included]
B
D
01
02
03
04
05
Страница 1: ...Manual Model AMFS15 Thank you for choosing this AMADA product At AMADA we strive to provide you with the best quality products and services in the industry Should you have any issues please don t hesi...
Страница 2: ...er mounting incorrect assembly or inappropriate use Thank you for your understanding IMPORTANT SAFETY INFORMATION Tools Needed Not lncluded Stud Finder Pencil Phillips Screwdriver Level Drill 5 64 in...
Страница 3: ...and level it Then mark the 4 pilot holes using a pencil not included 1A 4 Install the side frames using lag screws C and D Tighten the lag screws C and D only until they are pulled rmly against the w...
Страница 4: ...he wall 1B 3 Secure the drywall anchors E into the 4 pilot holes using phillips screwdriver 1B 1 Attach the boards A to the side frames B 1B 2 Position the assembled oating shelf on your desired heigh...
Страница 5: ...Then mark the 4 pilot holes using a pencil not included 1C 3 Drill 4 pilot holes using a 15 64 in 6mm diameter drill bit Make sure the depth is not less than 2 11 64 in 55mm Never drill into the morta...
Страница 6: ...A A 1C 5 Install the side frames using lag screws D Tighten the lag screws D only until they are pulled rmly against the wall Step 2 Secure the Boards A to the Side Frames B Not Included B B D B B D...
Страница 7: ......
Страница 8: ...uct purchase We hope that you are as happy with your product as we are designing and manufacturing it for you We strive to provide you with the best quality products and services in the industry Shoul...