background image

Programming: 

The BMV-712 Battery Monitor

2

3

4

AM Solar Inc.

3555 Marcola Rd.

Springfield, OR 97477

541.726.1091

www.amsolar.com

Programming on the BMV-712 Battery Monitor in the Victron 
Connect App: 

1. Download “VictronConnect” from the Google Play Store (picture 1).

2. Turn on your Phone’s Bluetooth, and get as close as possible to your Victron 

Component(s).

3. Open the Victron Connect app, and after it takes a moment to scan it will 

recognize your BMV-712.

              NOTE: 

If your device is not shown, it is probably signal interference. Try 

closing the app and moving to a different location before re-entering the app in a 
location that can pick up the BMV's signal.

4. Select the BMV-712 on the Device List (picture 2).

5. Press the gear icon in the top right corner (picture 3).

6. Enter “Battery” and change the values to match the colored box at the top right 

(screen shown on picture 4):

7.

Changing Battery Capacity

: Enter the number

of Ah of your entire battery bank.

8.

Charged Voltage

: 14.4

9.

Tail Current: 

2%

10.

Peukert Exponent:

  1.1

11.

Charge Efficiency Factor:

 98%

12. Go back to Settings, enter “Misc”

13.

Aux Input

: Select “Temperature”

14.

Temperature Unit:

 Select “Fahrenheit”

15. Exit from settings, you have completed

programming.

                 NOTE: 

Only one phone can be connected

 to each device at a time. Be sure to completely 

disconnect and close the app to log out.

1

NOTE: To change the PIN code from the app, go back to the device list page in the app. Click on the three circles to the right of your device, and select “Reset PIN code”.

Programming Your BMV-712 Smart Battery Monitor for Expion Lithium Batteries

Program Settings for Expion Batteries 

Battery Capacity

:  Enter the total battery capacity in Amp Hours.

Charged Voltage

: 14.4

Tail Current

:  2%

Peukert Exponent

:  1.1

Charge Efficiency Factor

:  98%

Aux Input

: “Temperature”

Temperature Unit

:  “Celsius”  or  “Fahrenheit”

Rev.20181204

Содержание 99-TRLSLV

Страница 1: ...99 TRLSLV Adventurer Trailer Kit Installation Guide AM Solar Inc 3555 Marcola Rd Springfield OR 97477 541 726 1091 www amsolar com Online Guide Rev 20181204...

Страница 2: ...Complete bill of materials broken down by subsystem listing quantities part numbers and descriptions with QR codes to link data sheets for major components Detail of the Battery Bank subsystem connec...

Страница 3: ...the fuse panel Use the string to make the small wire runs rope for heavy gauge and label them tape and stickers works well Then layout the all the components that fit the interior of your rig to prep...

Страница 4: ...me to schedule your installation work with the professionals at AM Solar Sturdy Ladder Hammer Crimper Hammer Heat Gun Wire Crimper Wire stripper Cable Cutter Multimeter Screwdriver Smartphone PC Drill...

Страница 5: ...Trailer Kit Bill of Materials AM Solar Inc 3555 Marcola Rd Springfield OR 97477 541 726 1091 www amsolar com Solar Panels Lithium Battery AMS Control Board Inverter Charger Charge Controller Battery...

Страница 6: ...A 3 GRY CABLE 10GA 3 GRY Sub Panel Inverter Remote Inverter Charger Master Disconnect AM Solar Inc 3555 Marcola Rd Springfield OR 97477 541 726 1091 www amsolar com AC Input TEM P 200Ah Solar wire pen...

Страница 7: ...a shunt is used the load side of the shunt becomes the new negative battery terminal and no negatives will connect to the actual battery Battery Bank 99 TRLSLV Adventurer Trailer Kit AM Solar Inc 355...

Страница 8: ...R ZS90S FSTSET ZAMP SEAL SKF SEAL SKF SEAL SKF SEAL SKF 92C PREP CABLE 6GA 2 GRY Modified Zamp 90W Solar Panel Mounted Dimensions 39 56 x 19 88 x 1 38 Modified Zamp 90W Solar Panel Mounted Dimensions...

Страница 9: ...e power outlet Note Adapters from 30A to 15A outlets can be purchased at hardware or RV supply stores The shore power charges the battery bank and can also be passed through the inverter to the AC loa...

Страница 10: ...ller image and select Reset PIN Code 5 Click on the gear in the top right corner 6 Click on Battery 7 Click on the settings and adjust them acccordingly to match below Battery voltage 12V Max charge c...

Страница 11: ...ktop NOTE Remember the location of the download on your computer so you can open the file later c You will now install the program Double click the file you downloaded d Your PC may prompt you with a...

Страница 12: ...tton back toward the center position Click Next k The window will say Connect part 2 turn the inverter back ON with the black button Click Next l The window will say Ready to program click Next m The...

Страница 13: ...to to the Device Manager on your PC If you can t locate it just search for Device Manager in the search bar Scroll down to Universal Serial Bus Controller which should be near the bottom Expand the l...

Страница 14: ...d box at the top right screen shown on picture 4 7 Changing Battery Capacity Enter the number of Ah of your entire battery bank 8 Charged Voltage 14 4 9 Tail Current 2 10 Peukert Exponent 1 1 11 Charg...

Страница 15: ...etwork picture 3 5 Enter a name for your network picture 4 Linking Each Device 1 Enter the Victron Connect App and click on a device 2 Go to Settings shown as a gear symbol in the top right picture 1...

Отзывы: