Page 3
Communicate Configuration to
Central Station
Test Complete Operation
Complete the account configuration with your Central Station using information located on
the Communication tab
• Provide the BAT-Fire’s NCC (also located on the box and unit label)
• Provide the configured supervision interval timing(s) for the installation
Confirm operations based on the LEDs and by manipulating your FACP
Note on AlulaConnect Event Log:
BAT-Fire event logs on AlulaConnect attempt to record and mirror all events sent to the configured Bosch
receiver(s). There may be small time discrepancies within the event log records, and in certain supervision
failure scenarios, events may be captured on the platform or at the receiver(s) that are not recorded on
the other. Examples include: Failure of comms to one of platform or receiver, and logging of any receiver
generated event.