
- 4 -
Trove2 S2 ULXB Kits Installation Guide
T2SSK7514(D): Access Controller Position Chart for the S2-INST Installation Kit:
1. Align S2-INST mounting holes with pems on TSS2
(Fig. 3, pg. 4)
.
2. Attach S2-INST to backplane with lock nuts (provided)
(Fig. 3a, pg. 4)
.
3. Mount backplane to enclosure with hardware.
4. Fasten TSS2 backplane to Trove2 enclosure utilizing hardware (provided).
Fig. 3
S2-INST
Installation Kit for
S2 Network Node
L
G
N
BAT FAIL
AC FAIL
NC
C
NO
NC
C
NO
AC
DC
- BAT
+
+ DC -
AC DELAY
Altronix
AL1024ULXB2
N
COMMON POWER OUTPUT
S
P
FUSED POWER OUTPUT
S
1
2
3
4
5
6
7
8
D1
INPU
T
P
N
R1
LE
D
Altronix
PD8UL
N
COMMON POWER OUTPUT
S
P
FUSED POWER OUTPUT
S
1
2
3
4
5
6
7
8
D1
INPU
T
P
N
R1
LE
D
Altronix
PD8UL
RSB2
OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 OUTPUT 5 OUTPUT 6 OUTPUT 7 OUTPUT 8
NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM
IN GND IN GND IN GND IN GND
IN GND IN GND IN GND IN GND
1 2 3 4
5 6 7 8
INPUT
TRIGGER
10A 250V
+INP- T + RET-
NO C NC
FACP INTERFACE
Power Control
- + -
+
F1 F2 F3 F4 F5 F6 F7 F8
MAIN
TRG
FACP
1 2 3 4
1 2 3 4
O N
O N
1 2 3 4
1 2 3 4
O N
O N
Altronix - ACM8(CB)
OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 OUTPUT 5 OUTPUT 6 OUTPUT 7 OUTPUT 8
NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM
IN GND IN GND IN GND IN GND
IN GND IN GND IN GND IN GND
1 2 3 4
5 6 7 8
INPUT
TRIGGER
10A 250V
+INP- T + RET-
NO C NC
FACP INTERFACE
Power Control
- + -
+
F1 F2 F3 F4 F5 F6 F7 F8
MAIN
TRG
FACP
1 2 3 4
1 2 3 4
O N
O N
1 2 3 4
1 2 3 4
O N
O N
Altronix - ACM8(CB)
+ BAT
-
L G N
BAT FAIL NC C NO NC C NO AC FAIL
AC
DC
- DC
+
Altronix
AL1012ULXB
Pem
Lock nut
S2-INST Bracket
Backplane
Fig. 3a