Trove1RAL Series Installation Guide
- 3 -
Installation Instructions for Altronix Trove Rack Kits:
Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local
codes and authorities having jurisdiction. These products are for indoor use only and must be installed within
the protected premises.
Note:
First assemble and Install Z Bracket Wire Management Accesory
(refer to Z Bracket Installation pg. 4)
1. Remove backplane from enclosure prior to installing into rack cabinet
(do not discard hardware).
2. In order to mount included UL Listed tamper switch (Altronix Model TS112 or
equivalent) turn the enclosure upside down. Punch out the knockout in
designated location, on the back of the unit, from outside of the drawer
(Fig. 1, pg. 3)
. Insert the tamper switch into the knockout from outside of the
drawer with the button facing outwards and spaded connectors inside the drawer.
Connect tamper switch wiring to the Access Control Panel input or the
appropriate UL Listed reporting device.
To activate alarm signal open the rack drawer.
3. Slide the rack enclosure into an open 2U location in the four post rack cabinet.
4. Utilizing proper fasteners attach front ears to the rack rails.
5. Attach the rear of the adjustable slides to the rear rails of the rack cabinet with the proper fasteners.
6. Secure the rack cover
(Fig. 2a, pg. 3)
and rack drawer to earth ground
(Fig. 2b, pg. 3).
7. Make sure that all internal cofigurations (wiring, voltage selection, switch settings, etc.) are
complete before mounting backplane back into enclosure.
8. Refer to the
eFlow Power Supply/Charger Installation Guide
for eFlow6NB and corresponding sub-assembly
Installation Guides for the following models: ACMS8, PDS8, VR6 for further instructions.
Fig. 1
Back of the drawer,
viewed from outside.
Tamper Switch
mounting location
Fig. 2
Fig. 2a
Fig. 2b