Chapter
2:
Installation
4.
Remove
the
External
Cap
from
the
Rail
Frame
by
pulling
it
upwards
through
the
rail
guides
on
the
Rail
Frame.
External
Cap
PnP
Cover
Cap
5.
The
CPU
Package
is
shipped
from
the
factory
with
the
Carrier
Frame
pre-assembled.
Grip
the
handle
of
the
Carrier
Frame/CPU
Package
assembly
from
its
shipping
tray,
and
while
gripping
the
handle,
align
the
flanges
of
the
Carrier
Frame
onto
the
rails
of
the
Rail
Frame
so
its
pins
will
be
at
the
bottom
when
the
Rail
Frame
is
lowered
later.
6.
Slide
the
Carrier
Frame/CPU
Package
downwards
to
the
bottom
of
the
Rail
Frame.
Ensure
the
flanges
are
secure
on
the
rails
as
you
lower
it
downwards.
Carrier
Frame/
CPU
Package
25