![Alton Victorian Elmhurst Porch DW 9x12 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/alton/victorian-elmhurst-porch-dw-9x12/victorian-elmhurst-porch-dw-9x12_instruction-manual_2912750026.webp)
26
Frame Assembly
Diagram 36
Diagram 37
Diagram 35
Before fixing this corner make sure the inside
faces are all flush (diagram 35). When you are
happy that the purling is located correctly (it is
normal that the purling is set back slightly
from the glass rebate on the front of the
building) start by inserting the 80mm screw
through the side of the eaves bar into the
tenon on the end of the purling.
Next insert the 100mm screw vertically down
through the roof corner bar into the eaves bar
and finally securing the side corner bar
(diagrams 36 and 37).
Internal
80m
m CS
K Scr
ew
EV
04
83
EV04
15
EV0491
Eaves ba
r
100m
m CSK Screw
100m
m Screw
EV0415
EV
04
83
EV0491
Ex
ternal
X-ray
6
Содержание Victorian Elmhurst Porch DW 9x12
Страница 1: ...07 14 07 19 ELMHURST 9DW 9 x 12 9 x 8 ELMHURST PORCH DW ...
Страница 5: ...5 ...