![Alton SUMMERHOUSE MICKLETON Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/alton/summerhouse-mickleton/summerhouse-mickleton_instruction-manual_2912727036.webp)
36
The middle capping should be position over the glazing bar below, it is best to find the centre point
with a tape measure before fixing. Fix this top and bottom, once you are happy with its position
insert the last 3 screws on each cap.
130mm
Diagram 64
60mm
Drill pilot hole
Fascias and Capping
Finally fix the mid roof capping in place, you will also need to trim these to length (the full length
capping is used on the optional slatted roof). Trim the end with the bevel so the square end that
goes at the bottom of the roof is kept tidy and pre-treated.
DO NOT CUT THESE IF YOU HAVE A
SLATTED ROOF
10
With all the capping fitted you can now trim any excess felt. Be very careful NOT to cut
through both layers of roof felt. Scoring down the side of the capping a couple of times
lightly is much safer than trying to cut through in one go!
Now move to
section 12.
Diagram 65
AB0058
Содержание SUMMERHOUSE MICKLETON
Страница 1: ...08 17...
Страница 12: ...12 Side Assembly Fit the opposite panel as you did the last Diagram 14 AB A0 03 8F 4...
Страница 25: ...25 Diagram 41 Roof Assembly 6 Make sure the ply roof sheet does NOT protrude past the soffits...
Страница 48: ...48 Notes...
Страница 49: ...49 Notes...
Страница 50: ...50 Notes...