19” Equipment Rack
1. Install M6 Cage Nuts into the square openings to provide an attachment point for the
M6 Mounting Screws.
a. From inside of the Mounting Rails, insert one of the flanges of the cage nut
through the square opening. Press against the side of the square opening.
b. Compress the cage nut at the sides slightly to allow the remaining flange to fit
through the square opening. When the cage nut is properly installed, both
flanges will protrude through the square opening and will be visible on the outer
surface of the mounting rail.
Repeat steps 1a and 1b until all required cage nuts are installed.
Note: 19
”
4U vertical bracket can hold up to 44 lbs. evenly distributed.
NS242412VFA1C-RV4U Enclosure
Installation Guide
2. After installing the required cage nuts, use the included M6 Mounting Screws and M6
Washers to secure your equipment.