BYK-Gardner GmbH
Getting Started | 3
295 024 855 E 2106
spectro2guide Pro
23
3 Getting Started
Please observe following notes when you put the instrument into operation.
• Assemble the entire system, consisting of instrument, docking station (option)
for more information.
• Place the instrument in the docking station and allow it to charge fully. The
docking station automatically
charges
the instrument and performs auto diag-
nosis. Consult
and
more information.
• Press the
Operate
button in order to turn the instrument on.
• Become familiar with the main menu for a quick navigation. Consult
for more information.
• Press the displayed icons on the touch screen with your finger or the stylus in
order to navigate through the menu and perform functions.
• Use the hand strap as protection against dropping the instrument.
• Use the software “smart-chart” to tap the full potential of the instrument.
Consult
3.1 System Diagram
3.1.1 System Setup for spectro2go
The entire system consists of instrument, power supply and software.
Connect instrument
(1)
via USB cable
(2)
with PC.
Download and install “smart-chart” software
(3)
.
Turn instrument on by pressing the
Operate
button.
If instrument is to be charged, disconnect USB cable from PC.
Connect instrument
(1)
via USB cable
(2)
with power supply
(4)
.
Содержание 345 000 016
Страница 1: ...Measure what you see spectro2guide Pro spectro2guide spectro2go Type 345 000 016 Operating Manual...
Страница 93: ...BYK Gardner GmbH 295 024 855 E 2106 spectro2guide Pro 93 Notes...
Страница 94: ...BYK Gardner GmbH 94 spectro2guide Pro 295 024 855 E 2106...
Страница 95: ...BYK Gardner GmbH 295 024 855 E 2106 spectro2guide Pro 95...