background image

www.alseautomation.com

0.2

STOCCO 5000 

 USER MANUAL

2.  Put the base plate into the cement (Cement standard GB175-2007). Size between base plate and cement height in picture c, size between front and back from the base
plate in picture d, Size between base plate and door rack in picture e.

 3.  Adjust the horizontal distance of the base plate 

0.05mm, and lock the nut. Debug base plate, Install the base plate cover (picture f) and the machine (picture g)

after cement is dry. Picture d is the Machine installation location. There are 6x M10x30 hexagon screw (with gasket).

3.  Check the packing list make sure that you can find every parts in your box without damage;
4.  If there is any problem with product model, accessories or any transport damage, please contact with the local dealer.

V.  Installation precautions

1.  Only professionals can install this equipment

2.  The machine must be installed correctly and the screws should be tightened

3.  The product must be grounded. Grounding resistance should be less than 4Ω. Please do not use the neutral line (zero line) instead of ground. Otherwise it will lead to

machine failure or unexpected consequences.

VI. Installation

1.  Fix the 4x M14 screws on the base plate, size according to picture b

Отзывы: