
13
Subject to change without notice | 83053700gUK – Translation into English of the original German operating manual | ait-deutschland GmbH
Use the insulating tape supplied to insulate the
connection clip. Use the enclosed fastening
materials to additionally fix the insulation.
NOTE:
We recommend completing step
after the
leak test.
NOTE:
The heat source and heating side must be
insulated from the heat pump; to this end we
recommend using the IPFK hydraulic connection
set in our range of products (not included in the
scope of delivery).
Install shut-off devices at the heating circuit.
Install shut-off devices at the heat source.
Place a bleeder at the highest point of the heat
source in the heat source outlet…
We recommend installing a dirt filter (screen size
0.9 mm) on the heat source inlet connection…
The hot water and heat source connections are
marked accordingly on the unit.
For the positioning of the connections, please
refer to the dimensioned drawing for the
respective model.
INSTALLING THE HOUSING
NOTE.
Remove the protective film from all facing panels.
NOTE.
The screws for installing the heat pump housing
are included in the scope of delivery.
Position the insulation included in the scope of
delivery under the baseplate.
NOTE.
Before screwing on the side panels, feed the patch
cable and + LIN bus cable through the rear panel!
see “electrical connection work”
Screw the two side panels onto the back panel using
3 screws for each:
Mount the profile rail onto the front of the unit,
between the two side panels, using 2 screws for
each side.
1 Profile rail
2 Screw