3 Operation
16
Alpha Technologies
3.3
Self Test
The battery test finds out if the batteries can provide backup power. It is started from the Param-
eters menu (Figure 3.1). This should not be done for the first 24 hours after a new unit is in-
stalled so the batteries can be fully charged. Every 30 days, the unit automatically does a battery
discharge test. If it finds a problem, it is displayed on the LCD.
Procedure
TIP:
If no buttons are pushed for 10 seconds, the LCD exits this menu and displays the operat-
ing mode.
1
Press the FUNC button for 5 seconds.
The first parameter, “O/P Volt Set” is displayed on the LCD (Figure 3.1).
2
Press FUNC to scroll through the parameters until “Battery Test” appears.
3
Press the ENTER button. When the LCD shows “Test?” press ENTER.
The test starts and the LCD shows “Battery Test.”
4
After the test, the unit resumes line mode and the LCD shows “Line Mode.” If a fault is found,
the FAULT LED is on. Do troubleshooting as described in Section 3.5.
Self Test Finished
3.4
Changing the Parameters
You can change the unit’s factory set parameters to suit your local conditions (Figure 3.1). Any
changes should be done after the unit is started, but before the loads are turned on.
Procedure
TIP:
If no buttons are pushed for 10 seconds, the LCD exits this menu and displays the operat-
ing mode.
1
Press the FUNC button for 5 seconds.
The first parameter, “O/P Volt Set” is displayed on the LCD.
2
Press FUNC to scroll through the parameters (Figure 3.1).
3
Press ENTER to select a parameter.