MULTIPOINT INSTALLATION
Installation & Test Run is very similar to single point water heater. Several areas need to be taken note
1
2
3
1. Identify INLET and OUTLET
2. Install the given Pressure Relief Valve at the INLET
3. Turn the mixer tap to the left (Hot) and let water flows through the tap before turning on the
heater switch out side the bathroom. This is applicable during 1
st
time installation to prevent damage
to the heating element.
After the above you may use the mixer tap as how you would use a mixer tap.
Pressure
Relief
Valve
24
Содержание MULTIPOINT Series
Страница 2: ...2...
Страница 3: ...FOR SINGLE POINT OPENED OUTLET HEATER For M5 and Smart 18 Series only 3...
Страница 6: ...15A 3 pin Plug ELECTRICAL REQUIREMENT 13A 3 pin Plug 6...
Страница 8: ...PARTS IDENTIFICATON 8...
Страница 9: ...PARTS IDENTIFICATON RAIN SHOWER 9...
Страница 10: ...INSTALLATION PROCEDURE 10...
Страница 19: ...SHOWER ACCESSORIES INSTALLATION 19...
Страница 20: ...RAIN SHOWER ACCESSORIES INSTALLATION 20...
Страница 21: ...RAIN SHOWER ACCESSORIES INSTALLATION 21...
Страница 22: ...RAIN SHOWER ACCESSORIES INSTALLATION 22...
Страница 23: ...MULTIPOINT INSTALLATION 6 0 kW 8 0 kW 23...
Страница 28: ...GUIDANCE 28...
Страница 29: ...4 1 5 2 3 MAINTENANCE clean stop valve 29...
Страница 30: ...2 1 MAINTENANCE clean hand shower filter mesh 30...
Страница 31: ...FOR MULTIPOINT MODELS MAINTENANCE Pressure Relief Valve 31...
Страница 32: ...TROUBLESHOOT 32...
Страница 33: ...TROUBLESHOOT 33...