Alpha Evoke 28 Скачать руководство пользователя страница 45

45

8.20  DHW HEAT EXCHANGER - Fig. 7.6

Gain access and drain the boiler heating and hot water circuits as described in Sections 8.1 and 8.2.
1.  Remove condensate trap as in Section 8.11.
2.  Using a 4 mm Allen key remove the two bolts securing the Plate heat exchanger to the hydro block assembly.
3.  Slide the heat exchanger to the left hand corner of the boiler and rotate it forwards from its right hand side through the 

centre of the boiler to remove.

4.  Remove and replace the seals in the back of the hydro block housing.
5.  Replace in reverse order making sure that the printed writing on the heat exchanger is at the top.
6.  Refill and pressurise the system. (Refer to Commissioning, Section 6.1)

8.21  DIVERTER VALVE MOTOR - Fig. 8.2

Switch the boiler to Standby ( ).
Gain access as described in Section 8.1.
1.  Push the clip on the plug and pull the plug from the diverter motor.
2.  Lift the motor upwards and forwards to remove from the valve body.
3.  Test the boiler in heating and hot water mode to ensure the motor is correctly engaged with the diverter valve spindle.

8.22  DIVERTER VALVE CARTRIDGE - Fig. 8.2

Gain access and drain the boiler heating circuit as described in Sections 8.1 and 8.2.
1.  Remove the diverter valve motor as described in Section 8.21.
2.  Using the supplied tool and a suitable spanner turn the diverter valve cartridge anticlockwise until its retaining lugs hit 

the stops.

3.  Withdraw the cartridge taking care not to spill any water onto any electrical components.
4.  Insert the new cartridge with the locating lug at the top and push firmly into place. Using the supplied tool and a suitable 

spanner turn the cartridge clockwise until the retaining lugs are locked into position.

5.  Pull the diverter pin fully out into the CH position and connect the diverter motor as in Section 8.21.
6.  Test the boiler in heating and hot water mode to ensure the motor is correctly engaged with the diverter valve spindle.

8.23  EXPANSION VESSEL - Fig. 7.6

Note:

 Check that the pressure of the new vessel is 1 bar before it is installed.

Gain access and drain the boiler heating circuit as described in Sections 8.1 and 8.2.
1.  Remove the top side panel fixing screw.
2.  Disconnect the copper pipe from the bottom of the vessel. 
3.  Remove the top fixing nut from the air valve.
4.  Remove the bottom fixing screw and withdraw the vessel taking care not to spill any water into other boiler components.
5.  Re-assemble in reverse order.
6.  Refill and pressurise the system. (Refer to Commissioning, Section 6.1).

8.24 COMBUSTION CHAMBER INSULATION

1.  Remove the complete burner/fan/air inlet assembly as described in Routine Servicing, Section 7.3.
2.  Open the three spring clips (see Fig. 7.5) and carefully lift off the insulation panel. It may be necessary to remove the 

electrode assembly first as described in Section 8.3.

3.  To remove the rear insulation panel, open the four clips and prise out the panel.
4.  Fit the new panel(s) and re-assemble in reverse order referring to Routine Servicing, Section 7.5.
5.  Test the boiler, check the ignition and test the combustion as described in Section 7.

8.25  ALPHA CONTROLS (if fitted) 

Refer to section 4.11 on the connection options for boiler controls.

Alpha Evoke 28 and 33 - Component Replacement

Содержание Evoke 28

Страница 1: ...871 8764 website www alpha innovation co uk Set for use with Natural Gas Leave these instructions with the User These instructions have been carefully prepared but we reserve the right to alter the s...

Страница 2: ...eport product faults and concerns to the manufacturer in a timely manner Customer Service Show the customer any identity card that is relevant to the work being carried out prior to commencement or on...

Страница 3: ...tion for Water Heating Appliances BS 6798 2009 Specification for Installation gas fired boilers up to 70 kW BS 6891 2005 A2 2008 Installation of low pressure Gas Pipework IGEM UP 2 Installation of pip...

Страница 4: ...erminal connection point READ AND UNDERSTAND THE INSTRUCTIONS Read and understand the appliance s instructions before performing any operation carefully following the indications provided RECOVERABLE...

Страница 5: ...perature Set point C Gas burner injector diameter mm DHW flow rate at 35 C rise l min DHW flow rate at 30 C rise EN13203 1 l min Dry NOx weight net calorific value mg kWh Dry NOx ppm NOx Class Factory...

Страница 6: ...eed range in the boiler parameter menu Fixed The pump runs at a constant speed by setting the same minimum and maximum speeds See parameters A1 and A2 in Section 6 13 Constant The pump speed is contro...

Страница 7: ...closed dotted area A B Head available with by pass closed B Head available with by pass open C D Power consumed by the pump with by pass open dotted area D Power consumed by the pump with by pass clo...

Страница 8: ...Appliance Must Be Earthed Optional integral single channel controls are available if required Note Only use the Alpha single channel controls Do not fit any two channel controls 3 6 ELECTRICAL CONNECT...

Страница 9: ...Flue test point pressure point 18 Air test point pressure point 19 Burner 20 Primary return sensor 21 Fan 22 Automatic air vent 23 Boiler pump 24 Primary pressure switch 25 DHW heat exchanger 26 Diver...

Страница 10: ...must be designed and constructed specifically for the purpose i e comply with the Building Regulations 4 4 FLUE SYSTEM Figs 4 1 4 2 The flue system must be installed in accordance with BS 5440 1 When...

Страница 11: ...al Boiler Information L A B 90 bend 1 3 metre L A 2 x 45 bends 1 8 metre Fig 4 2 VERTICAL FLUE OPTIONS Hmax 14 m Hmax 12 2 m 14 m 1 8 m 12 m B A A B A HORIZONTAL FLUE OPTIONS Lmax 12 metres Not less t...

Страница 12: ...sition must allow the free passage of air across it at all times 8 The flue terminal must be positioned where products of combustion will freely disperse and not cause a nuisance 9 Where a terminal is...

Страница 13: ...ustible material without the use of a special thermal insulation barrier If the boiler is to be fitted in a timber framed building it should be fitted in accordance with the Institute of Gas Engineers...

Страница 14: ...d for the system unless separate zone valves have been installed 4 8 FILLING THE CENTRAL HEATING SYSTEM Fig 4 6 The system design pressure cold should be set to 1 0 bar This pressure is equivalent to...

Страница 15: ...rom entering and damaging the boiler Once the system condition has been restored an effective magnetic filter and strainer should be fitted permanently to the system as a method of collecting any magn...

Страница 16: ...be made to treat the feed water to the hot water circuit of combination boilers to reduce the rate of accumulation of limescale To ensure economic use the pipe runs between the boiler and taps should...

Страница 17: ...ting of the flue using the flue sealing collar supplied cut a 130 mm dia flue hole using a 127 mm core drill 5 Drill the fixing holes 10 mm dia to accept the No 10 plugs supplied Using the screws supp...

Страница 18: ...a sack truck or other suitable trolley Always grip the boiler firmly and before lifting feel where the weight is concentrated to establish the centre of gravity repositioning yourself as necessary Ap...

Страница 19: ...d Note Always ensure that there is a minimum overlap of 25 mm when fully extending the telescopic section 4 Pass the flue assembly through the wall from inside or outside Note Internal fitting If ther...

Страница 20: ...by pushing the inside flue sealing collar up to the wall The hole around the flue can be made good using the flue sealing collars supplied or using a suitable sealant cement if required Fig 5 8 Fittin...

Страница 21: ...ensure the slope towards the boiler is correct 3 Determine the overall flue length as described in Section 4 6 paragraph 2 to determine the number of Alpha CD 750 or 1000 mm flue extensions required 4...

Страница 22: ...securing the terminal and remove the terminal by pulling it from the flue assembly Remove the screw 2 in Fig 5 12 securing the terminal end section and remove the end section from the terminal ii Loc...

Страница 23: ...sy Flue Ensure there is a slope of approximately 3 back towards the Easy Flue Fig 5 13 Note The equivalent horizontal flue assembly length the equivalent plume management length PM length must not exc...

Страница 24: ...t and correct operation of the boiler Please note that using controls that are not supplied or recommended by Alpha may invalidate the boiler warranty and may not control the boiler correctly Alpha of...

Страница 25: ...er to parameter P7 see Section 6 13 to select the correct parameter to allow the boiler to operate with alternative control type 1 External Sensor Weather compensation feature The E Tec Plus boilers h...

Страница 26: ...remove the air Vent each radiator in turn starting with the lowest in the system 5 Check the operation of the safety valve see Fig 7 6 by turning the head anti clockwise until it clicks The click is...

Страница 27: ...nd the RESET button remains active on the boiler control panel along with the standby button off mode only and the display where the functioning state is shown Note If the boiler is switched off the C...

Страница 28: ...for hot water by opening a hot tap etc is sensed by the flow switch the pump starts the fan will run and the burner lights increasing immediately to its maximum output Water in the boiler is then div...

Страница 29: ...er will have a higher noise level this is normal 6 7 FINAL COMMISSIONING 1 Allow the heating system to heat up then balance the system to achieve the necessary temperature difference across the heatin...

Страница 30: ...electric and gas supplies Replace the injector located on the upper fitting of the gas valve and re seal the connections Fig 7 6 Re instate gas and electric supplies Calibrate the new fan speed for LP...

Страница 31: ...with no DHW demand use the DHW down button to set the output to minimum 0 Insert the analyser probe into the flue test point Fig 6 3 and check that the CO2 value is as specified in Section 3 1 otherw...

Страница 32: ...ing the CH up and down buttons you can adjust its value To access the programming menu press andholdthe RESET and INFO buttons atthesametimefor5seconds thedisplay will show two flashing dashes next en...

Страница 33: ...pump active 7 Alpha Trace heating cable enabled 8 Not used 9 FlowSmart function enabled The boiler pump can function in two ways 0 Intermittent The pump is controlled according to the heating request...

Страница 34: ...ater request the boiler will switch to central heating mode if there is a request It is possible to set a time delay in which the boiler waits before changing back to heating mode in order to quickly...

Страница 35: ...e analyser manufacturers requirements 3 Competence can be demonstrated by satisfactory completion of the CPA1ACS assessment which covers the use of electronic portable combustion gas analysers in acco...

Страница 36: ...system pressure is zero 2 The expansion vessel pressure test point is accessible from on top at the top left side 5 Check that the condensate trap drain pipe is connected and all joints are sound 6 R...

Страница 37: ...nels Fig 7 4 8 Remove the screws H securing the side panel I Lift the side panel and pull it forwards unhooking it from the rear panel view A in Fig 7 4 Lower the panel out and away from the top cover...

Страница 38: ...ctrodes If they are in good condition remove any oxide deposits using a fine abrasive paper If it is necessary to replace the electrode assembly ensure a new gasket is used 3 Check that the fan is cle...

Страница 39: ...te trap 9 DHW flow switch 10 Gas injector 11 Gas valve 12 DHW heat exchanger 13 Boiler drain point 14 DHW temperature sensor 15 Test points air A flue F 16 Flue temperature sensor 17 Four fixing nuts...

Страница 40: ...e pipe 6 Re fit the ignition lead to the electrode 7 Check all the connections are sound and re commission Sections 6 3 and 6 8 8 Raise the control panel and clip into place 9 Check that the insulatio...

Страница 41: ...ponents and care must be taken when removing them 8 3 IGNITION AND SENSING ELECTRODES Fig 7 6 Gain access as described in Section 8 1 1 Pull off the ignition lead from the electrode 2 Remove the cap s...

Страница 42: ...he PCB cover ensure no wires are trapped and all wiring is secured Secure cover with three screws do not over tighten 6 Set the correct parameters for the correct boiler model as described in Section...

Страница 43: ...ve 6 Fit the new switch and re assemble in reverse order 7 Visually inspect for leakage after reconnecting the mains cold water supply 8 13 PRIMARY HEAT EXCHANGER Fig 7 6 Gain access and drain the boi...

Страница 44: ...Refill and pressurise the system Refer to Commissioning Section 6 1 8 17 PUMP HEAD Fig 7 6 Gain access and drain the boiler heating circuit as described in Sections 8 1 and 8 2 1 Disconnect the two w...

Страница 45: ...th the locating lug at the top and push firmly into place Using the supplied tool and a suitable spanner turn the cartridge clockwise until the retaining lugs are locked into position 5 Pull the diver...

Страница 46: ...s M1 Y Br G Y Bk PWM GND FEED Bl Br L N B2 S4 G GY GY G Y1 Y R Br Br Bk Bl M E3 M30 Br Y Bk Br R Bl 6 1 9 1 W P Or R W Or P R W W P P Fuse 3 15 AF Vcc HS UB GND Vcc M20 Bl W R Bk Br Br R Bl W Bk 1 5 X...

Страница 47: ...sel pressure 1 bar Leak in system Expansion relief valve operated Primary pressure switch Check sensor wiring and connections Check sensor resistance Check the settings of the A family parameters Chec...

Страница 48: ...ir flow blocked Flue restriction Flue sensor fault Pump fault Batteries require replacing Check the pump operation it may be necessary to free the pump shaft refer to Section 3 4 Check the pump wiring...

Страница 49: ...de for 24 hrs to allow the display to be read To permanently reset the error Sr E97 1 Enter the parameter menu using the password 69 See Section 6 13 2 Parameter P6 will show 0 3 Set P6 to any value a...

Страница 50: ...sate connecting pipe Expansion vessel Fan Flue sampling point cap Complete boiler seal kit Hydraulic circuit seal kit Complete heat exchanger seal kit Gas pipe to fan manifold Gas pipe O ring Clip Flo...

Страница 51: ...Low temperature means for condensing boilers 30 C for low temperature boilers 37 C and for other heaters 50 C return temperature Model s Evoke 33 Condensing boiler YES Low temperature boiler NO B1 bo...

Страница 52: ...COMPLIANCE WITH REGULATION 811 2013 Parameter value Yearly energy consumption for the hea ting function QHE 1 5 GJ Yearly electricity consumption for the domestic hot water function AEC 29 kWh Yearly...

Страница 53: ...uenced by further factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size and characteristics Seasonal space heating energy efficiency of...

Страница 54: ...II III I Auxiliary electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123 131 130 150 160 170 163 188 200 213 M L XL XXL 3 2...

Страница 55: ...ficiency once installed in a building as the efficiency is influenced by further factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size...

Страница 56: ...36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123 131 130 150 160 170 163 188 200 213 M L XL XXL 3 2 3 2 The energy efficiency of the package of products provided for in this fiche may not correspon...

Страница 57: ...57 Alpha Evoke 28 and 33 Page intentionally Blank...

Страница 58: ...re and record Gas rate m hr OR ft hr Burner operating pressure if applicable mbar OR Gas inlet pressure mbar Central heating fow temperature C Central heating return temperature C COMBINATION BOILERS...

Страница 59: ...gister No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate C...

Страница 60: ...the National Gas Emergency Service immediately on 0800 111 999 8 ELECTRICAL SUPPLY The boiler requires a 230 240 V 50 Hz supply fused at 3 A To connect a plug The colour of the wires in the mains lea...

Страница 61: ...em for external condensate drainage pipework incorporating an external frost thermostat should be considered 7 GAS SAFETY REGULATIONS Current Gas Safety Installation and Use Regulations It is the law...

Страница 62: ...not the desired room temperature The time and temperature will still be maintained according to the setting of the room thermostat 3 HEATING AND HOT WATER TEMPERATURE Fig 2 External weather compensat...

Страница 63: ...mer or Winter settings by pressing the Mode button item 1 in Fig 1 Summer setting The boiler will only provide hot water when a tap is turned on and the central heating will not activate even if reque...

Страница 64: ...enoaks Kent TN15 7RS For Technical help or for Service call ALPHA HELPLINE Tel 0344 871 8764 website www alpha innovation co uk Set for use with Natural Gas Leave these instructions with the User Thes...

Отзывы: