Alpha CD12S Скачать руководство пользователя страница 26

26

Alpha CD12S/20S/28S - Routine Servicing

7  ROUTINE SERVICING

To ensure efficient operation of the boiler it is recommended that it is checked and serviced as necessary at regular intervals. 
The frequency of servicing will depend upon the particular installation conditions and usage, but in general once per year 
should be adequate.
It is the law that any service work must be carried out by a competent person, i.e. Gas Safe registered personnel.

Warning: 

Before servicing the boiler, isolate the electrical supply and close the boiler gas service cock. Allow the boiler to cool.

The data label is positioned on the inside of the left hand side panel.
Always test for gas tightness after servicing any gas carrying components.
Always carry out electrical system checks i.e. Earth Continuity, Resistance to Earth, Short Circuit and Polarity with a suitable 
meter after servicing.

General
Please Note: 

During routine servicing, and after any maintenance or change of part of the combustion circuit, the following 

must be checked:
 

1.  The integrity of the flue system and the flue seals, as described in Section 4.6 and 4.7.

 

2.  The integrity of the boiler combustion circuit and relevant seals.

 

3.  The operational (working) gas inlet pressure at maximum rate, as described in Section 5.5.3.

 

4.  The combustion performance, as described in Section 7.

Competence to carry out the check of combustion performance
Please Note: 

BS 6798:2009 Specification for installation and maintenance of gas-fired boilers of rated input not exceeding 

70 kW net

 advises that:

 

1.  The person carrying out a combustion measurement should have been assessed as competent in the use of a 

flue analyser and the interpretation of the results.

 

2.  The flue gas analyser used should be one meeting the requirements of BS 7927 or BS-EN 50379-3 and be 

calibrated in accordance with the analyser manufacturers' requirements, and

 

3.  Competence can be demonstrated by satisfactory completion of the CPA1ACS assessment, which covers the use 

of electronic portable combustion gas analysers in accordance with BS 7967, Parts 1 to 4.

Combustion check

Connect the flue gas analyser to the flue gas sampling point as shown in Fig. 29.

Notes: 1. 

Prior to servicing, it is recommended that a flue gas analyser is used to measure the performance of the boiler 

(refer to Fig. 28 for the position of the flue sampling point). If the CO/CO

2

 ratio measured is greater than 0.003 

or

 when other checks and comments from the customer have indicated that there may be problems, cleaning of 

the heat exchanger will be necessary. All Sections 7.1, 7.2, 7.3 and 7.4 

must 

be carried out. Repeat the flue gas 

analyser test after reassembling the boiler and check that the CO/CO

2

 ratio is less than 0.003.

 

  If the CO/CO

2

 ratio reading is still above, then you must repeat Sections 7.1, 7.2, 7.3 and 7.4 until you obtain a 

ratio reading of below 0.003.

 

  If the combustion reading is greater than the acceptable value AND the integrity of the complete flue 

system and combustion circuit seals have been verified and the inlet gas pressure (and gas rate) have 
been verified. Please call our Technical Helpline.

 

2.

  If the CO/CO

2

 ratio measured is less than 0.003 and other checks and comments from the customer suggest 

there are no problems then only Section 7.1 and Section 7.2 paragraphs 1, 2 and 3 need to be carried out  to 
allow a visual check of the components within the room sealed chamber.

 

3.

  If a flue gas analyser is not available, then all Sections 7.1, 7.2, 7.3 and 7.4 

must 

be carried out.

7.1  IMPORTANT NOTES PRIOR TO SERVICING

1.  Check the flue terminal outside and ensure it is not blocked.
2.  Run the boiler and check the operation of its controls.
3.  Refer to Fig. 2 for location of flue sampling point.
4.  Ensure that all system connections and fittings are sound. Remake any joints and check the tightness of any fittings that 

may be leaking.

5.  Refill, vent and re-pressurise the system as necessary. (Refer to Commissioning, Section 5.1).
 

If the system pressure exceeds 2.5 bar when operating at maximum temperature, the heating expansion vessel should 
be checked and re-pressurised, if necessary.

 

Notes: 1. 

Check the expansion vessel charge only when the system pressure is zero.

 

 

2.

  The expansion vessel pressure test point is accessible from inside the boiler at the top.

6.  Check that the condensate trap drain pipe is connected and all joints are sound.
7.  Record details of the service in the Service Record in Section 12.

Содержание CD12S

Страница 1: ...Alpha CD12S G C No 41 532 16 Alpha CD20S G C No 41 532 18 Alpha CD28S G C No 41 532 20 British Gas Service Listed For use with Natural Gas only Leave these instructions with the User 0051 Nepicar Hou...

Страница 2: ...gulations issued by the Scottish Development Department UK Water Regulations Byelaws Scotland Health Safety Document No 635 The Electricity At Work Regulations 1989 The installation should also be in...

Страница 3: ...11 950 3 5 11 950 3 3 11 260 0 33 0 13 0 37 13 0 Room sealed chamber panel fitted Central Heating Heat Input Hs kW Gross Btu h Heat Input Hi kW Net Btu h Heat Output Hs condensing kW 50 C 30 C Btu h H...

Страница 4: ...ended System Pressure cold CH Water Temp Approx max 2 5 bar 0 5 bar 82 C 3 bar 44 PSI 8 L at 0 8 bar 22 mm 22 mm 15 mm 1 0 bar 82 C 180 F 2 2 SYSTEM Burner Main Heat exchanger DHW Heat Exchanger Main...

Страница 5: ...000 42 200 18 100 kW 25 40 18 70 15 60 12 35 5 30 Output 50 30 C Available pump head metres 2 3 3 5 3 8 4 0 4 6 feet 7 6 11 6 12 6 13 2 15 2 litre min 16 6 12 6 10 5 8 3 3 2 20 C 20 C Flow rate This...

Страница 6: ...mostat 14 Expansion vessel 15 Automatic air vent 16 Pump 17 Drain point 18 Pressure relief valve 19 Primary pressure switch 20 Ignition electrodes 21 Flame sensing electrode 22 Venturi negative point...

Страница 7: ...ally please note that the Easy Flue inner duct already has a pre determined slope towards the boiler for condensate to run back towards the boiler When additional flue extensions are used ensure the f...

Страница 8: ...F 245 mm 90 bend 1 3 metre add 40 mm to F if a jig is used L B C 245 mm 2 x 45 bends 1 8 metre Fig 3 VERTICAL FLUE OPTIONS Not less than 300 mm Not less than 300 mm H Hmax 15 m Not less than 300 mm No...

Страница 9: ...duced to 25 mm without effecting the performance of the boiler However to ensure the condensate plume does not affect adjacent surfaces a clearance of 300 mm is preferable 3 These clearances may be re...

Страница 10: ...installation of the boiler in a room or internal space containing a bath or shower Where a room sealed boiler is installed in a room containing a bath or shower it must not be possible for a person us...

Страница 11: ...le This is a device fitted in the heating return within the optional Premier Pack wall jig to remove any foreign or solid matter etc from the system Note A drain tap should be installed at the lowest...

Страница 12: ...e old boiler is still working i Switch on the boiler and allow the system to heat up to the normal operating temperature ii Rapidly drain the system while the water is still hot iii Refill and chemica...

Страница 13: ...the bottom of the tube Holes to face away from house Cement mortar sealing 100mm plastic tube Bottom of tube sealed Soakaway depth 400mm filled with limestone chippings 500 mm min Fig 9 External gully...

Страница 14: ...Ensure line is level Rear exit hole 110 mm dia Position of 110 mm hole to be cut for side exit flue 145 mm 4 1 UNPACKING 1 The boxes required when the boiler is installed with a horizontal flue are a...

Страница 15: ...ave been tightened especially the union bends Note If applicable the heating union bends supplied with the wall jig have been designed to enable the heating pipes to be routed from above and or below...

Страница 16: ...ng system 3 Adjust the telescopic section of the flue to the distance L ensuring that the two labels marked TOP are aligned then seal and secure the joint between the ducts with the sealing tape suppl...

Страница 17: ...er the outer duct and pull the flue assembly towards the bend locating the inner duct into the seal joint on the bend Ensure the labels marked TOP are positioned at the top before securing the flue as...

Страница 18: ...rporates the seal joint Ensure the inner duct end without the seal joint is cut so that it is 20 mm longer than the outer duct Ensure that all cuts are square and free from burrs Once assembled with t...

Страница 19: ...s to the terminal from outside i Remove the screws 1 in Fig 22 securing the terminal and remove the terminal by pulling it from the flue assembly Remove the screw 2 in Fig 22 securing the terminal end...

Страница 20: ...minal end section from CD Easy Flue PM length C 4 x 93 bend 5 2 m C Terminal end section from CD Easy Flue Ensure there is a slope of approximately 3 back towards the Easy Flue Fig 23 Note The equival...

Страница 21: ...1 for connecting to terminals 3 and 4 4 Replace the terminal block ensuring it is located correctly on the plastic pins and replace the cover 5 Ensure that there is sufficient free cable to allow the...

Страница 22: ...er soundness rectifying where necessary Disconnect the filling loop from the mains supply Water may be released from the system by manually operating the drain point see Fig 2 until the system design...

Страница 23: ...nd return pipes at the boiler and check the system volume and pressure Refer to Technical Data Sections 2 1 and 2 2 2 Turn off the boiler 4 Thoroughly flush out the water pipework refer to Section 3 9...

Страница 24: ...er that an internal frost thermostat is fitted in the boiler and that the electrical supply to the boiler must be left on for the thermostat to operate i e the selector switch must be set to ON or FRO...

Страница 25: ...will operate until the water temperature in the system reaches approximately 30 C Any other pipework outside the boiler should be protected from the risk of freezing and protected with insulation Add...

Страница 26: ...lyser to the flue gas sampling point as shown in Fig 29 Notes 1 Prior to servicing it is recommended that a flue gas analyser is used to measure the performance of the boiler refer to Fig 28 for the p...

Страница 27: ...rush with metallic bristles as this might damage the injector 4 Remove any deposits from the heat exchanger coils This can be done by suction or water sprayed onto the coils Ensure all electrical comp...

Страница 28: ...exchanger This is to ensure the condensate trap is full of water before operating the boiler 2 Replace the combustion chamber front assembly ensuring it is correctly located 3 Ensure the electrode lea...

Страница 29: ...ng is secured Secure with five screws do not overtighten 8 2 DRAINING THE BOILER Figs 2 14 Isolate the electricity supply and close the boiler gas service cock see Fig 14 Allow the boiler to cool Heat...

Страница 30: ...overheat thermostat and remove it from the flow pipe 4 Fit the new overheat thermostat and re assemble in reverse order 8 10 FLUE TEMPERATURE SENSOR Fig 31 1 Gain access behind the front panel as desc...

Страница 31: ...8 14 CLOCK if fitted Fig 21 Note For replacement only use an Alpha two channel clock Do not fit a single channel clock 1 Gain access behind the control panel as described in Section 8 1 2 Remove the t...

Страница 32: ...ssioning Section 5 1 8 17 COMBUSTION CHAMBER INSULATION Gain access to the combustion chamber as described in Section 8 1 Front panel insulation Fig 30 1 Remove the electrodes from the combustion cham...

Страница 33: ...pressure switch 3 Unscrew the switch from the primary flow pipe 4 Using the new washer supplied re assemble in reverse order When connecting the wiring to the new switch the polarity of the wires is...

Страница 34: ...trap 3 Place a container under the boiler and unscrew the bowl at the bottom of the trap see Fig 14 Some water will spill from the trap 4 Remove the screw securing the trap to the bottom of the boiler...

Страница 35: ...Y Gy G W Bl W Bl Pk Pk Br Bk Bl W P Fuse F2A Link Supply 230 240V 50Hz Fused at 3A 2 1 N L Pump Br Bl Gas Valve Overheat Thermostat X3 1 2 X8 3 2 1 X4 1 2 3 4 X13 4 5 3 2 1 X6 4 3 2 1 X12 4 5 3 2 1 X...

Страница 36: ...TROL REMOVE LINK FROM TERMINALS 1 AND 2 AND CONNECT 240 V SWITCHED LIVE TO TERMINAL 1 240 Vac 24 Vac S3 S1 S2 Main PCB CH CAP MAX CAP X7 X3 1 2 X8 3 2 1 X4 1 2 3 4 X13 4 5 3 2 1 X6 4 3 2 1 X12 4 5 3 2...

Страница 37: ...UT Pump runs and fan runs Go to section page 35 I YES Go to section page 34 D Burner output modulates until set temperature is reached Burner goes out NO YES Operation sequence successful Pump continu...

Страница 38: ...y temp sensor faulty Cold resistance approx 12 14 k ohms resistance reduces with increase in temp i e when hot resistance is approximately 3 k ohms Check and correct connections wiring at sensor and P...

Страница 39: ...at exchanger Do not Note J Replace primary pressure switch Replace PCB Continuity across primary pressure switch terminals Unplug leads from primary pressure switch is there 5V DC at PCB across X9 con...

Страница 40: ...front Condensate trap Description British Gas GC No Alpha Pt No 1 024483 1 023999 1 023979 1 025585 1 024872 1 024388 1 024240 1 021750 1 023576 1 023673 1 024097 1 029719 1 021715 1 027959 1 024296 1...

Страница 41: ...Central heating flow temperature C Central heating return temperature C FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING The condensate drain has been installed in accordance with the manufacturer s...

Страница 42: ...4 Date Engineers name Company name Telephone No Gas Safe ID card serial No CO CO2 Initial ratio Final ratio Faults Repairs carried out Engineers signature SERVICE 5 Date Engineers name Company name Te...

Страница 43: ...43 Alpha CD12S 20S 28S...

Страница 44: ...been carefully prepared but we reserve the right to alter the specification at any time in the interest of product improvement Alpha Therm Limited 2011 Alpha Therm Limited NepicarHouse LondonRoad Wrot...

Отзывы: