Page
20
to
62
Program
Description
Selectable option
12
Setting voltage point back
to utility source when
selecting “SBU” (SBU
priority) in program 01.
Setting range is from 44V to 51V.
Increment of each click is 1V.
13
Setting voltage point back
to battery mode when
selecting “SBU” (SBU
priority) in program 01.
Battery fully charged
54V (default)
Setting range is from 48V to 58V. Increment of each click is 1V.
16
Charger source priority:
To
configure
charger
source priority
If this inverter/charger is working in Line, Standby or Fault
mode, charger source can be programmed as below:
Solar first
Solar energy will charge battery
as first priority.
Utility will charge battery only
when
solar
energy
is
not
available.
Solar and Utility (default)
Solar energy and utility will
charge battery at the same time.