20
We reserve the right to modify technical specifications without prior notice.
UK830533/200610
© Alpha-InnoTec GmbH
Flushing, filling and bleeding
the system
proceed as follows:
flush, fill and bleed the heating circuit…
In addition, bleed the condenser of the heat pump…
•
open the lower facing panel…
•
open the bleed valve…
following bleeding, close the lower facing panel.
Insulating the hydraulic
connections
Insulate the vibration decouplers and the pipes of the
heating circuit.
notICe.
Insulate in accordance with applicable
local standards and directives.