![Alpha-InnoTec Hydraulic tower HT7 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/alpha-innotec/hydraulic-tower-ht7/hydraulic-tower-ht7_operating-manual_2906144020.webp)
20
Subject to technical amendments without prior notice | 83070100bUK | ait-deutschland GmbH
14.3 Emergency operation
Heating and heat pump controller HPC operating
manual, “Comfort malfunction” section
Thermostat for emergency operation
In emergency operation, the flow temperature is set
via the electric heating element thermostat (
①
) ac
-
cording to the needs of the heating circuits in opera-
tion.
Adjustment range: 40°C – 80°C
Factory setting: Stop on left-hand side = frost protec-
tion
1
►
Set the temperature of the thermostat to the de-
signed heating system.
IMPORTANT
Setting the temperature too high can damage the in-
sulation and the heating system.
NOTE
The maximum available heating capacity in
emergency operation is 2 kW.
15 Dismantling and disposal
15.1 Dismantling
►
Separate components by their materials.
15.2 Disposal and recycling
►
Recycle unit components and packaging materi-
als in accordance with local regulations, or ensure
they are disposed of properly.