___________________________________________________________________
Alpha ESS Co., Ltd.
Page 22 of 75
Your Smart Energy
5.
Unpacking
5.1
Check the Outer Packing
Before unpacking the battery pack and inverter, check the outer packing for damage,
such as holes and cracks. If any damage is found, do not unpack the product and
contact your dealer as soon as possible.
5.2
Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage.
Contact your distributor if the scope of delivery is incomplete or damaged.
SMILE-S6-HV-INV Hybrid Inverter
Inverter
(X1)
Upper Wall
Bracket (X1)
Lower Wall
Bracket (X1)
Inverter
Positioning
Paper Plate (X1)
Wall Anchor
ST6*55 (X6)
(Optional)
Indoor Use
Outdoor Use
PV+&PV-
Connectors
(X2)
Cord End Terminal
(X8)
10 Pin Terminal
Block (X1)
WiFi Module (X1)
Terminal
Resistor (X1)
Ring Terminal
Lug (X4)
Screw M5*10 (X4)
Screw M6*16 (X2)
T20 Screwdriver
(X1)
CT (X1)
(Optional)
Grid-CT Cable
(X1) (Optional)
Installation
Manual (X1)
Magnet Ring (X1)
PC Gasket (X1)