zz
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 31 of 69
Your Smart Energy
7.1
Overview of the Connection Area
Position Designation
1
Battery breaker of battery pack
2
Power button of battery pack
3
BAT+ connection port
4
BAT- connection port
5
BMS Communication connectors
6
Grid connection port
;
7
Backup connection port
;
8
Connection point for an additional grounding
9
Communication port
(
CAN/RS485,BMS, LAN, Meter/Grid-CT,
DRM, PV-CT, AUX
)
10
Battery breaker of SMILE-B3-PLUS
11
Connection port for the WiFi module
*
All breakers of SMILE-B3-PLUS are switched off when shipped.