______________________________________________________________________
Alpha ESS Co., Ltd.
Page 17 of 31
Your Smart Energy
Installation
Step15.
In order to remain the earth continuity on battery, please following the procedure
below for earthing
Step16. Use a screwdriver to remove the right communication panel.
Step17. The battery DIP switch is configured according to the black mark position shown
in the figure below. That is, for the farthest battery from the inverter, the DIP switch 2 and
3 of the battery is on, and the other numbered battery DIP switches are all downwards.
Содержание eSTORE-BAT-10.3
Страница 1: ...Installation Manual Battery Module eSTORE BAT 10 3 AU V04 ...
Страница 2: ......