Alma CRYO-TRONIQUE CO2 Скачать руководство пользователя страница 4

1. PREPARE THE OPERATION

G

U

 7

0

9

2

 F

R

 B

 -

 4

0

5

0

v0

.1

.x

  

 F

O

R

M

 D

O

C

 1

2

4

 B

DISCHARGING

Open V1

SINGLE HOSE

DOUBLE HOSE

PRESSURIZE PUMP

OPEN PV2 ?

PRESURE LIQUID

OPEN PV1 ?

Start pump cooling

PUMP COOLING

Control pump cooling

PRESSURIZE HOSEE

Connect the hose(s)

Supply the variator

Open V9 then close it back

Open V5 with double hose

Open V7 to put the pipe under pressure. Then close it back

Start the operation (§2)

3. CONTINUE THE OPERATION

Continue the operation (§3)

4. END THE OPERATION

5. COMPLETE THE OPERATION

CLOSE VALVES ?

Open V2, V4 and V7 then V11 (and V15) to drain the pipe(s)

2. CARRY OUT THE OPERATION

   START THE OPERATION

START DISCHARGING

START PUMP?

PRIMING

DISCHARGING

Open V4 while closing V2

CONTINUE OPERATION

280

L  

kg

/

/min  

END OPERATION

 999

L  

kg

/m

3

/min  /h

OPERATION FINISHED

 999

L  

kg

/m

3

/min  /h

Back to normal display is automatic: DO NOT PRESS RED STOP BUTTON 

TO KEEP FROM INTERRUPTING OPERATION.

During an operation, the information that follow are available. Values 
are displayed 10 seconds

Display the delivery information

PUMP SUCCION

PUMP OUTLET

PRESSURE LIQUID

GAS RETURN (RG3)

CHARGING (RL4)

DISCHARGING (RL1)

METER TEMPERATURE

PUMP TEMPERATURE

Open V2 at 1/3 of its capacity

MEANING OF SYMBOLS

Optional action

Mandatory action

Event during delivery

Action by operator

PRESSURE PUMP

PRESSURE HOSE

OPERATION FINISHED

Back to main menu

Close again the valves and disconnect the hose(s)

PRESSURE LIQUID

Continue (§3) or end (§4) the operation 

Continue (§3) or end (§4) the operation 

INTENTIONAL INTERRUPTION OF THE OPERATION

APPEARANCE OF A FAULT AND DISPLAY OF AN ALARM

Interruption of the operation

ARRET OPERATION

(see list of alarms)

Validate with

With active option

With active option

Отзывы: