ALM Boss Bow Tie Скачать руководство пользователя страница 6

Patch Ideas

Voltage Controlled Transposition 

- Patch CV sequence to be transposed into 

Beast’s Chalkboard top ‘In’. Patch Thru output to Boss Bow Tie (BBT) top right I/O, patch 

Chalkboard top section output to 2nd BBT right I/O, patch lower section Beast output 

to 3rd BBT I/O. Set Chalkboard dials to required transposition octaves. Patch BBT left 

single I/O to Oscillator pitch input. Patch control signal (ie from LFO/other sequencer 

etc) to BBT control input. Adjust BBT Attenuverter to limit range of incoming 

control signal to first 3 I/O’s.

Rhythmic sequencing -

 Patch constant gate (i.e ‘--’ trigger from Pamela’s workout)  

into left BBT I/O. Patch 16th trigger (i.e. ‘4’ multiplier trigger from Pam - widened 

slightly) into BBT gate input. Patch right BBT I/O’s into triggered drum modules/

patches (dupe outs via mults/cables etc). Patch random control signal to BBT control 

input. Adjust BBT Attenuverter to taste. 

M185 style sequencing - 

This patch requires at least a dual channel sequencer - i.e 

for this example we use the Make Noise Brains and Pressure Points. Patch various 

Pam trigger multiplied outputs (i.e 1,2,3,4) to  BBT right hand side. Dupe ‘1’ trigger into 

sequencer clock. Patch left hand side I/O into envelope generator. Patch sequencer 

channel 1 pitch output to VCO (which goes to VCA controlled by envelope generator) .  

Patch channel 2 output to BBT control input and adjust BBT attenuverter so sequencer 

output range matches number of trigger inputs. Now channel 2 controls the step count 

for each sequencer stage. Patch can be further varied by changing duped trigger or 

duping I/O output instead. Experiment with different (or no) trigger values.

Glitchy Waveshape Sequencing -

 Patch various unique oscillator wave shape 

outputs to right hand side BBT I/O’s. Patch left side BBT I/O to VCA etc. Patch control 

signal and adjust. Experiment. Run control signal at audio rates.

ALM-007 - ‘Boss Bow Tie’

6

Содержание Boss Bow Tie

Страница 1: ...ALM 007 Boss Bow Tie Operation Manual ALM 007 Boss Bow Tie...

Страница 2: ...Introduction 3 Technical Specifications 3 Core Operation 4 Panel Layout 4 General Usage 5 Patch Ideas 6 Limited Warranty 7 Support 8 2...

Страница 3: ...tch allowing for rhythmic and other effects The module is intended primarily for flexible routing of CV signals Though audio signals will work audible clicks can sometimes be apparent when switching I...

Страница 4: ...Control signal input Level maps I O s Attenuverter knob to attenuate invert control signal Offset knob to add an offset voltage to control signal Gate input Low disables switch high enables normalise...

Страница 5: ...ol input together with the offset and attenuverter setting The offset adds a voltage to the incoming control voltage This for example is useful for moving a negative going LFO up to cover the full swi...

Страница 6: ...to BBT control input Adjust BBT Offset Attenuverter to taste M185 style sequencing This patch requires at least a dual channel sequencer i e for this example we use the Make Noise Brains and Pressure...

Страница 7: ...pply to Physical damage arising for mistreating i e dropping submerging etc Damage caused by incorrect power connections Overexposure to heat or direct sunlight Damage caused by inappropriate or mis u...

Страница 8: ...ws additional info downloads and firmware updates please visit the ALM website at http busycircuits com and follow busycircuits on twitter Please send any questions or comments to info busycircuits co...

Отзывы: