![AllSportSystems SUPERBAY 10W x 9H Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/allsportsystems/superbay-10w-x-9h/superbay-10w-x-9h_setup-manual_2903968034.webp)
All
SportSystems, Inc.
©
2020.
Step 24 - Install Cascading C Panel
The last cascading panel to be installed is the C Panel. It will be installed on the top center,
overlapping the other panels already installed. It will attach in a similar manner as the previous panels
by wrapping the velcro edge around the front pole.
IMPORTANT:
Prior to wrapping the velcro edge around the front pole, fold corners back (see diagram
below). This will prevent these corners from dropping down where there is no velcro available to hold
them in place.
SkyRailPlus™ Customers:
Slits will need to be cut into the C Panel in order to wrap the leading
edge of the panel around the front pole and the arms of the SkyRailPlus™.
TOP VIEW
BOTTOM VIEW
Additional C panels may be included depending on the width of your enclosure.
Page 34 of 48
February 3, 2020