MS888G2 User Manual
11
Alloy Computer Products Pty Ltd Copyright ©2006
• Power On
Please Note:
⇒
The Alloy MS888G2 uses a 100-240 VAC, 50-60 Hz power supply. The power supply will
automatically convert your local AC power source to DC power for use by the switch.
1. Ensure that the power switch is turned off before connecting mains power.
2. Connect the power cord supplied with the switch to your nearest mains outlet.
3. Connect the other end of the power cord into the IEC power port on the switch.
4. Repeat above steps for each power supply module.
5. Turn the switch on.
6. When initial power is applied, all the LED indicators will light up for a brief period while the
system performs its startup tests. Once the initial tests (‘POST test’) have completed all
except the power and CPU LED should return to an off state.
• Firmware Loading
After power on, the boot-loader will load the switch firmware into the main operational memory.
This process will take about 30 seconds. Once completed, the switch will flash all the LED’s once
and then switch to a ready state.
Содержание MS888G2
Страница 1: ...User Manual MS888G2 24 Port Modular SNMP Managed Switch Version 1 01 June 2006...
Страница 121: ...MS888G2 User Manual 117 Alloy Computer Products Pty Ltd Copyright 2006 Fig 4 3...
Страница 135: ...MS888G2 User Manual 131 Alloy Computer Products Pty Ltd Copyright 2006 Day light Saving End Mth 1 Day 1 Hour 0...
Страница 215: ...MS888G2 User Manual 211 Alloy Computer Products Pty Ltd Copyright 2006 None Example MS888G2 log clear...
Страница 230: ...MS888G2 User Manual 226 Alloy Computer Products Pty Ltd Copyright 2006...