2.1 Pre-installation Guidelines
Select the optimal locations for the equipment using the following guidelines:
-
The ALL0558N should be mounted on a 1"- 4" pole. Its location should enable easy
access to the unit and its connectors for installation and testing.
-
The higher the placement of the antenna, the better the achievable link quality.
-
The antenna should be installed to provide a direct or near line of sight link with the base
station antenna. The antenna should be aligned to face the general direction of the base
station.
2.2 Installing the ALL0558N
To install the ALL0558N, use the following procedure to mount the device on a pole and refer
to the figure below.
1.
The bottom of the ALL0558N is a removable cover. Grab the cover and push down
slightly while pulling it backward to remove the cover.
2.
Insert a standard Ethernet cable into the RJ-45 port labeled
MAIN LAN
.
3.
Slide the cover back to seal the bottom of the ALL0558N.
4.
Remove the power cord and PoE injector from the box and plug the power cord
into the DC port of the PoE injector.
Only use the power adapter supplied with the ALL0558N. Using a different
power adapter might damage the ALL0558N!!
5.
Plug the other side of the Ethernet cable in Step 3 into the PoE port of the PoE