21
• If necessary, mount the respective
drive/pressure rollers (16/17)
and set the desired transmission ratio
(see Chapter “Change gear speed”).
• The welding wedge has been set to a factory setting for 2 mm membranes.
• Switch on the wedge welder via the
main switch (2)
.
• Set the welding force and the contacting system (see Chapter “Setting the welding parameters”).
• Set the welding parameters (temperature/speed)
(see Chapter “Speed and temperature setting before welding”).
• Switch on heating with the
“Heating On/Off” key
. The
heating key
must be pressed and held for
1 second
. Afterwards an acoustic signal is sounded and “Heating on” appears briefly in the display.
Before starting the device, check the power cord, the plug and the extension cable for electrical and
mechanical damage.
Connect the device to an outlet with a
protective conductor. Any interruption of the protective
conductor inside or outside of the device is not permitted.
Only use extension cables with protec-
tive conductors.
The local
supply voltage
must match the line voltage specified on the device. If the
line voltage
fails,
switch off the main switch and place the welding machine in the park position.
If the device is being used on construction sites, a
fault current circuit breaker
must be used to
protect site personnel from electrical shock
due to dampness and moisture.
8.4 Starting the device