SECTION 12.0
LIFTING & TRANSPORT
If the hammer is to be transported inde-
pendently of the carrier;
1. Remove all loose debris from hammer.
2. Follow removal instructions in Section
7.9.
3. Secure hoses to unit to avoid accidental
damage.
4. Lift the hammer at approved lift points
only with appropriate lifting equipment.
See Figure 12-1.
~
WARNING
Do not lift the hammer by the
mounting pins. The hammer may
shift and cause damage or
personnel injury.
5. Adequately stabilize and secure the
hammer for transport.
If the hammer is transported while in-
stalled on the carrier:
1. Remove all loose debris from hammer.
2. Secure hoses to unit to avoid accidental
damage.
3. Inspect the mounting pins and hard-
ware for damage and integrity.
12-1
6-1-03
A
LLIED
Street Hammer
AS Series
LIFT POINT
Figure 12-1. Hammer Lift Point