
16
Operation - 295 Loader
7. Continue to drive the tractor forward until the subframe uprights are seated in the boot.
8. Secure the subframe uprights with the bolts and washers. Torque 500 ft-lb.
When mounting for the first time, the front hook
bolts will have to be tightened after positioning
the hook directly over the mounting boss (most
rearward position)
9. Raise the loader and lock the support stand tubes in the up position.
When mounting for the first time, raise the loader
slowly and check to make sure that the hoses do
not bind or become pinched in all positions. Work
the loader and bucket up and down to work out
all the air in the hydraulics. Check and refill the
tractor's hydraulic system.
Содержание 295
Страница 1: ...Operator and Parts Manual 012012 Loader Models 295 P1582 ...
Страница 2: ......
Страница 6: ...6 Specifications 295 Loader Specifications ...
Страница 10: ...10 Safety 295 Loader Safety Decals ...
Страница 11: ...11 Safety 295 Loader Important Precautions ...
Страница 24: ...24 Parts 295 Loader Sub Frame Assembly ...
Страница 26: ...26 Parts 295 Loader Main Frame Assembly ...
Страница 28: ...28 Parts 295 Loader Hydraulic Plumbing Assembly ...
Страница 35: ......